Laing O’Rourke–Kone Vertiq lifts: modular rail stations explained for engineers
Reviewed by Tom Sullivan

First reported on The Construction Index
30 Second Briefing
Vertiq, a joint venture between Kone and Laing O’Rourke, will supply five modular elevators for two railway stations, using offsite-manufactured lift shafts and car assemblies to accelerate programme delivery. The system is being deployed alongside accessibility upgrades by Octavius, targeting step-free access and reduced platform interface works during possessions. For contractors and station owners, the modular approach cuts on-site lift installation time and complexity, with most structural and M&E integration completed in factory conditions.
Technical Brief
- Vertiq’s modular lifts arrive as pre-assembled car, shaft and machinery units for craned installation.
- Factory-built shafts integrate structural steel, guide rails and M&E containment before delivery to site.
- Interface detailing is standardised so Octavius can tie into existing station structures with minimal bespoke steelwork.
- Plug-and-play electrical terminations reduce live-track working time around existing signalling and power systems.
- Pre-testing of lift operation in controlled conditions cuts commissioning duration during rail possessions.
- Vertiq’s approach is tailored to brownfield stations with constrained access and limited laydown space.
- Reduced on-site wet trades around lift shafts lowers programme risk from weather-related delays.
- Similar modular lift systems could de-risk future station upgrades where possession windows are progressively shrinking.
Our Take
Laing O’Rourke’s JV activity with Kone, Vertiq and Octavius on rail lifts sits alongside its Bylor joint venture at Hinkley Point C, signalling a consistent preference for partnering with specialist suppliers on complex, safety‑critical packages.
With Laing O’Rourke’s order book recently reported at £17.2bn and strong UK infrastructure demand in our database, this kind of standardised lift-installation JV is likely aimed at de‑risking delivery and freeing internal capacity for higher‑margin structural and hospital schemes.
The move aligns with Laing O’Rourke’s push into industrialised, offsite construction via Crown House Technologies Manufacturing and Explore Manufacturing, suggesting that lift systems for rail projects could increasingly be integrated into a broader prefabricated station or substructure offering.
Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.
Related Articles
Related Industries & Products
Construction
Quality control software for construction companies with material testing, batch tracking, and compliance management.
Mining
Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.
QCDB-io
Comprehensive quality control database for manufacturing, tunnelling, and civil construction with UCS testing, PSD analysis, and grout mix design management.


