Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy
    Sustainability
    Projects

    Kier sustainability director appointment: delivery and ESG governance lens for project teams

    February 17, 2026|

    Reviewed by Tom Sullivan

    Kier sustainability director appointment: delivery and ESG governance lens for project teams

    First reported on The Construction Index

    30 Second Briefing

    Kier has appointed long-serving executive Tracey Collins as sustainability director, giving her overall responsibility for the contractor’s environmental and social sustainability strategy across its UK infrastructure portfolio. Collins, previously director of emerging talent, inclusion and social sustainability, will work alongside Ben Stone, who remains group head of environment, and Verity Magee, who continues to lead social value. The move consolidates Kier’s ESG governance, signalling tighter integration of carbon, resilience and community objectives into project delivery and supply chain requirements.

    Technical Brief

    • Collins brings 15 years’ internal experience in training, learning and development to the sustainability brief.
    • Her most recent remit combined emerging talent pipelines, inclusion programmes and social sustainability delivery.
    • Ben Stone remains focused on environmental management as group head of environment, separating technical environment from governance.
    • Social value delivery continues under Verity Magee, implying a three‑pillar ESG leadership structure.
    • Kier’s mission statement links infrastructure delivery to climate adaptation, protection and socio‑economic value creation.
    • Leadership messaging frames sustainability as central to operational decision‑making rather than a standalone compliance function.

    Our Take

    Kier’s creation of a dedicated sustainability director role comes as it is taking on more public-sector work such as the £120m Darlington government hub and major retrofit schemes in Edinburgh, where whole-life carbon and social value metrics are increasingly embedded in procurement.

    Within our infrastructure coverage, Kier appears frequently in stories involving UK councils and central government clients, so a group-level sustainability lead is likely aimed at tightening compliance with evolving UK regulatory frameworks, including proposals in the Single Construction Regulator Prospectus.

    With 729 infrastructure stories and 2005 tag-matched pieces on sustainability and projects in our database, Kier’s move signals that large UK contractors are formalising ESG leadership to stay competitive against peers like Vinci and Bovis Construction that are also repositioning for low‑carbon and public-sector pipelines.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Panama Canal Mixshield undercrossing: design and tunnelling lessons for engineers
    Infrastructure
    in 9 months

    Panama Canal Mixshield undercrossing: design and tunnelling lessons for engineers

    A 13.46m diameter Herrenknecht Mixshield TBM has broken through into the future Balboa station on Panama Metro Line 3 after completing the first-ever TBM undercrossing of the Panama Canal at depths exceeding 60m below sea level. The 5,600kW, 26,616kNm machine, fitted with an accessible cutterhead and more than 4,500 sensors linked via the Herrenknecht.Connected platform, has achieved peak advance of 150 segment rings (about 300m) per month through mixed sandstone, tuff, breccias and basalt. Around 1.5km of the 4.5km twin-track tunnel remains to final breakthrough.

    Hudson Tunnel funding deadline: schedule and risk takeaways for project teams
    Infrastructure
    in 8 months

    Hudson Tunnel funding deadline: schedule and risk takeaways for project teams

    Federal funding for New York’s US$16bn Hudson Tunnel Project has been frozen, forcing the Gateway Development Commission to suspend works from 6 February after spending over US$1bn and employing about 1,000 site workers. A Manhattan federal judge has issued a temporary restraining order, giving the administration until 5 p.m. on 12 February to restore reimbursements or appeal, while contractors warn that demobilisation, resequencing and remobilisation will add cost and delay. Sites are now in “safe-pause” mode, with dewatering, ground support and environmental monitoring maintained, and assembly of two Herrenknecht TBMs in New Jersey likely to slip beyond the planned spring 2026 launch without funding certainty.

    Implenia/Marti JV MehrSpur Zurich–Winterthur: design and risk notes for engineers
    Infrastructure
    in 5 months

    Implenia/Marti JV MehrSpur Zurich–Winterthur: design and risk notes for engineers

    Swiss Federal Railways has awarded an Implenia/Marti 50:50 joint venture five of six MehrSpur Zurich–Winterthur lots worth just under CHF 1.7 billion, including the 8.3 km Brüttener tunnel (Lot 240) with twin 10 m diameter single-track tubes and a 1 km spur to Zurich Airport. TBM excavation will start in August 2029, with a roughly ten-year construction phase using BIM for planning and execution and extensive special foundations, earthworks and embankments. Additional works cover full redevelopment of Dietlikon station, about 6 km of new track across Dietlikon and Wallisellen sections, multiple underpasses, bridges and the Neumühle railway bridge and Storchen underpass near Winterthur.

    Related Industries & Products

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    QCDB-io

    Comprehensive quality control database for manufacturing, tunnelling, and civil construction with UCS testing, PSD analysis, and grout mix design management.