Geomechanics.io

  • Free Tools
Sign UpLog In

    Geomechanics.io

    Geomechanics, Streamlined.

    © 2026 Geomechanics.io. All rights reserved.

    Geomechanics.io

    CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

    Industries

    MiningConstructionTunnelling

    Company

    Terms of UsePrivacy PolicyLinkedIn
    Projects

    Kanmantoo record copper output: brownfield underground lessons for mine planners

    April 24, 2026|

    Reviewed by Joe Ashwell

    Kanmantoo record copper output: brownfield underground lessons for mine planners

    First reported on Australian Mining

    30 Second Briefing

    Record copper production at Hillgrove Resources’ Kanmantoo underground mine in South Australia is being reported alongside active exploration and development by Caspin Resources and Group 6 Metals across Australian base and critical metals projects. Kanmantoo’s ramp-up signals stronger utilisation of existing underground infrastructure and processing capacity at a brownfield site previously operated as an open pit. For geotechnical and mining teams, the activity points to continued investment in underground copper, nickel and tungsten targets, with emphasis on resource extension drilling and re‑use of established shafts, declines and plant.

    Technical Brief

    • For similar brownfield assets, the Kanmantoo and Dolphin approaches underline value in re‑entering legacy pits and shafts.

    Our Take

    Hillgrove Resources’ record copper output at Kanmantoo follows the 2025 profit uplift noted in our February coverage, suggesting the underground operation is consolidating as a lower‑cost, higher‑throughput asset rather than a short‑term restart play.

    Across the 292 copper‑tagged pieces in our database, Kanmantoo is one of relatively few Australian underground copper mines showing both rising production and active exploration, which likely strengthens Hillgrove’s position when competing for capital against greenfield copper projects.

    With other recent Australian items highlighting Rincon and Auravelle’s early‑stage copper work, Hillgrove’s performance at Kanmantoo gives mid‑tier explorers like Caspin Resources a nearby benchmark for what a mature, high‑productivity copper operation can look like in the current cost environment.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Mining
    about 3 hours ago

    CiDi 2025 mining truck autonomy report: key integration lessons for engineers

    CiDi Inc’s 2025 full-year report shows revenue rising from RMB410 million as it scales autonomous haulage systems for mining fleets in China and overseas, competing with EACON Mining, Shanghai BOONRAY, TAGE Idriver and WAYTOUS. The company is deploying retrofit autonomy kits and full-drive‑by‑wire platforms on large rigid and wide‑body trucks, targeting multi‑truck fleets in open pits. Reported challenges include integrating mixed fleets from different OEMs, maintaining reliable GNSS and perception in deep pits, and aligning autonomy roll‑outs with existing haul road geometry and dispatch systems.

    Mining
    about 4 hours ago

    Tianjin Meiteng XRT sorters at Tajik-China Mining: process gains for engineers

    Tianjin Meiteng Technology has commissioned five XRT ore sorting systems for Tajik-China Mining Co’s lead-zinc operations in Tajikistan after completing trial runs in March 2026. The intelligent sorting line, supplied as a full-service system, is now in production at one of the country’s largest integrated mining enterprises. For process engineers, the move signals further uptake of sensor-based sorting in Central Asian base metals, with implications for upstream grade control, reduced haulage of waste and potential debottlenecking of downstream milling circuits.

    Mining
    about 4 hours ago

    Sandvik DR413i rigs for Glencore Alumbrera restart: drilling strategy notes for engineers

    Sandvik will supply three DR413i rotary blasthole drill rigs to Glencore for the restart of the Bajo de la Alumbrera copper mine in Argentina, with the order booked in Q1 2026. The first DR413i is due on site in April 2026, with the remaining two units scheduled for delivery in Q4 2026, supporting pre-stripping and production drilling for the brownfield operation. The deal signals early capital deployment into large-diameter rotary drilling capacity ahead of full-scale mine recommissioning.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental