John F Hunt directors: delivery and enabling works implications for project teams
Reviewed by Joe Ashwell

First reported on The Construction Index
30 Second Briefing
John F Hunt Regeneration has appointed Sam Peck as managing director of its industrial dismantling division, bringing demolition, groundworks, piling and structural interface experience from a decade as director of operations at Deconstruct (UK). The company has also hired Garrett Priestley as infrastructure & civils director, adding delivery experience from the M20 smart motorway upgrade, Beckton DLR depot extension, London City Airport and Peninsula Quays. Chief executive Ben Williams signals these hires are geared to scaling major national regeneration, infrastructure and enabling works schemes.
Technical Brief
- Industrial dismantling division leadership implies direct control over demolition sequencing, temporary works, and structural interface risk.
- Groundworks and piling experience at director level supports integrated enabling works packages rather than standalone demolition contracts.
- Combined CVs position John F Hunt Regeneration to self-perform more multi-disciplinary civils–demolition–remediation frameworks nationally.
Our Take
Within the 625 Infrastructure stories in our database, UK contractors like VolkerFitzpatrick and Bam Nuttall recur frequently on complex rail and airport interfaces, so John F Hunt Regeneration bringing in directors with London City Airport and Beckton DLR depot exposure positions it well for future brownfield transport hub work.
The presence of Galldris Group, Blu 3 and CA Blackwell alongside John F Hunt Regeneration in our coverage skews towards heavy civils and utilities packages, suggesting the new leadership is likely to reinforce Hunt’s role as an enabling and remediation specialist on multi-contractor frameworks rather than pure-build contracts.
Projects such as the M20 smart motorway upgrade and Peninsula Quays sit in corridors where we see repeated contract awards for phased infrastructure upgrades, so the 10–20 year experience profiles of the incoming directors are strategically valuable for navigating rolling programmes and repeat-client frameworks in the United Kingdom.
Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.
Related Articles
Related Industries & Products
Construction
Quality control software for construction companies with material testing, batch tracking, and compliance management.
Mining
Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.
CMRR-io
Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.
HYDROGEO-io
Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.
GEODB-io
Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.


