Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy
    Projects
    Contract Award

    John F Hunt directors: delivery and enabling works implications for project teams

    February 4, 2026|

    Reviewed by Joe Ashwell

    John F Hunt directors: delivery and enabling works implications for project teams

    First reported on The Construction Index

    30 Second Briefing

    John F Hunt Regeneration has appointed Sam Peck as managing director of its industrial dismantling division, bringing demolition, groundworks, piling and structural interface experience from a decade as director of operations at Deconstruct (UK). The company has also hired Garrett Priestley as infrastructure & civils director, adding delivery experience from the M20 smart motorway upgrade, Beckton DLR depot extension, London City Airport and Peninsula Quays. Chief executive Ben Williams signals these hires are geared to scaling major national regeneration, infrastructure and enabling works schemes.

    Technical Brief

    • Industrial dismantling division leadership implies direct control over demolition sequencing, temporary works, and structural interface risk.
    • Groundworks and piling experience at director level supports integrated enabling works packages rather than standalone demolition contracts.
    • Combined CVs position John F Hunt Regeneration to self-perform more multi-disciplinary civils–demolition–remediation frameworks nationally.

    Our Take

    Within the 625 Infrastructure stories in our database, UK contractors like VolkerFitzpatrick and Bam Nuttall recur frequently on complex rail and airport interfaces, so John F Hunt Regeneration bringing in directors with London City Airport and Beckton DLR depot exposure positions it well for future brownfield transport hub work.

    The presence of Galldris Group, Blu 3 and CA Blackwell alongside John F Hunt Regeneration in our coverage skews towards heavy civils and utilities packages, suggesting the new leadership is likely to reinforce Hunt’s role as an enabling and remediation specialist on multi-contractor frameworks rather than pure-build contracts.

    Projects such as the M20 smart motorway upgrade and Peninsula Quays sit in corridors where we see repeated contract awards for phased infrastructure upgrades, so the 10–20 year experience profiles of the incoming directors are strategically valuable for navigating rolling programmes and repeat-client frameworks in the United Kingdom.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Panama Canal Mixshield undercrossing: design and tunnelling lessons for engineers
    Infrastructure
    in 9 months

    Panama Canal Mixshield undercrossing: design and tunnelling lessons for engineers

    A 13.46m diameter Herrenknecht Mixshield TBM has broken through into the future Balboa station on Panama Metro Line 3 after completing the first-ever TBM undercrossing of the Panama Canal at depths exceeding 60m below sea level. The 5,600kW, 26,616kNm machine, fitted with an accessible cutterhead and more than 4,500 sensors linked via the Herrenknecht.Connected platform, has achieved peak advance of 150 segment rings (about 300m) per month through mixed sandstone, tuff, breccias and basalt. Around 1.5km of the 4.5km twin-track tunnel remains to final breakthrough.

    Hudson Tunnel funding deadline: schedule and risk takeaways for project teams
    Infrastructure
    in 8 months

    Hudson Tunnel funding deadline: schedule and risk takeaways for project teams

    Federal funding for New York’s US$16bn Hudson Tunnel Project has been frozen, forcing the Gateway Development Commission to suspend works from 6 February after spending over US$1bn and employing about 1,000 site workers. A Manhattan federal judge has issued a temporary restraining order, giving the administration until 5 p.m. on 12 February to restore reimbursements or appeal, while contractors warn that demobilisation, resequencing and remobilisation will add cost and delay. Sites are now in “safe-pause” mode, with dewatering, ground support and environmental monitoring maintained, and assembly of two Herrenknecht TBMs in New Jersey likely to slip beyond the planned spring 2026 launch without funding certainty.

    Implenia/Marti JV MehrSpur Zurich–Winterthur: design and risk notes for engineers
    Infrastructure
    in 5 months

    Implenia/Marti JV MehrSpur Zurich–Winterthur: design and risk notes for engineers

    Swiss Federal Railways has awarded an Implenia/Marti 50:50 joint venture five of six MehrSpur Zurich–Winterthur lots worth just under CHF 1.7 billion, including the 8.3 km Brüttener tunnel (Lot 240) with twin 10 m diameter single-track tubes and a 1 km spur to Zurich Airport. TBM excavation will start in August 2029, with a roughly ten-year construction phase using BIM for planning and execution and extensive special foundations, earthworks and embankments. Additional works cover full redevelopment of Dietlikon station, about 6 km of new track across Dietlikon and Wallisellen sections, multiple underpasses, bridges and the Neumühle railway bridge and Storchen underpass near Winterthur.

    Related Industries & Products

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.