Jefferson Tools infrared heaters: cold-weather safety notes for UK site engineers
Reviewed by Joe Ashwell

First reported on The Construction Index
30 Second Briefing
Jefferson Tools has launched three new infrared heaters for UK construction sites and workshops as sub-zero temperatures and ice warnings spread, led by the Infrared 51 delivering 51,000 BTU/hr (15kW) with an approximate 350m³ heating capacity. The clean-burning Infrared 51 uses radiant heat directed at people and surfaces, and includes a built-in thermostat, LED display, tip-over protection and a stainless-steel floor deflector. Two smaller Infrared Cabinet Heaters each use twin 1,200W ruby halogen elements (2.4kW total) with thermostatic control and are offered in both 110V and 230V for standard site and domestic supplies.
Technical Brief
- Radiant output is directed at operatives and work surfaces, limiting convective heating of ambient air.
- Tip‑over protection provides automatic shut‑off if the Infrared 51 is knocked or destabilised on site.
- Stainless‑steel floor deflector is intended to shield floor finishes from localised high radiant flux.
- Built‑in thermostat and LED display support controlled temperature set‑points and easier on‑site monitoring.
- Thermostatic control on cabinet units is aimed at regulating energy draw and preventing overheating in small rooms.
Our Take
Within our 960 Infrastructure stories, very few UK pieces focus on temporary heating hardware, so Jefferson Tools’ Infrared 51 and cabinet heaters sit in a relatively niche but critical part of site safety coverage compared with more common PPE or traffic-management products.
A 15 kW unit rated for around 350 m³ suggests these systems are sized for medium enclosed spaces such as welfare cabins or small workshops, meaning larger open-air construction areas in the UK will still need complementary frost-protection strategies (e.g. localised thawing or enclosure) rather than relying on a single heater type.
Dual 110 V and 230 V configurations align with typical UK site power distributions, which likely reduces the need for additional transformers or temporary power redesigns and makes it easier for contractors to standardise winter kit across different projects.
Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.
Related Articles
Related Industries & Products
Construction
Quality control software for construction companies with material testing, batch tracking, and compliance management.
Mining
Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.
QCDB-io
Comprehensive quality control database for manufacturing, tunnelling, and civil construction with UCS testing, PSD analysis, and grout mix design management.


