Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Simplified.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy
    Projects
    Contract Award

    Ivanhoe–Qatar critical minerals push in Africa: project finance lens for engineers

    November 21, 2025|

    Reviewed by Joe Ashwell

    Ivanhoe–Qatar critical minerals push in Africa: project finance lens for engineers

    First reported on MINING.com

    30 Second Briefing

    Ivanhoe Mines has signed a memorandum of understanding with the Qatar Investment Authority under which Qatar’s sovereign wealth fund will back Ivanhoe’s management in pursuing existing and new critical minerals projects in Africa. The collaboration targets large-scale copper, nickel and other battery-metal deposits across Ivanhoe’s pipeline, building on assets such as Kamoa-Kakula in the DRC. For engineers and project developers, the deal signals potential acceleration of feasibility studies, project financing and infrastructure build-out on African critical minerals hubs.

    Technical Brief

    • Backing from a sovereign wealth fund may reduce cost of capital for high upfront infrastructure (power, rail, ports).
    • For African host states, the structure signals potential for bundled mine–infrastructure deals rather than stand-alone pit developments.

    Our Take

    Ivanhoe’s recent commissioning of the $2 billion Platreef complex in South Africa, which includes nickel, copper and PGMs, shows it already controls a multi-commodity base that overlaps strongly with the ‘critical minerals’ basket now being targeted with Qatar in Africa.

    Among the 17 Mining stories in our coverage, only a handful explicitly centre on ‘critical minerals’, so this Ivanhoe–Qatar collaboration signals that African critical-mineral plays are starting to move from exploration headlines into project and contract-level activity.

    Qatar’s involvement alongside Ivanhoe in African critical minerals is likely to introduce deeper Middle Eastern capital into project financing, which can reduce dependence on traditional Western lenders for large-scale African mine builds and expansions.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Epiroc–Major Drilling DiscovOre system: safety and cycle-time notes for drill engineers
    Mining
    about 8 hours ago

    Epiroc–Major Drilling DiscovOre system: safety and cycle-time notes for drill engineers

    Epiroc and Major Drilling are advancing the DiscovOre and Arrow 3S wireline core barrel system, first introduced in 2016 to boost mineral exploration drilling performance while reducing manual handling at the drill string. The system integrates a latch mechanism and overshot design that allow inner tubes to be retrieved without workers leaning over the rotating drill string, cutting exposure to dropped-object and entanglement hazards. Current development focuses on further cycle-time reductions and safer operation in deep-hole, high-angle exploration drilling.

    Mining
    about 8 hours ago

    Civmec’s A$400m BHP and Fortescue awards: delivery and ECI notes for project teams

    Civmec has secured more than A$400 million in new contracts and extensions with BHP and Fortescue, converting a previously flagged pipeline of brownfield and sustaining capital opportunities into firm work. The awards, spanning structural, mechanical and piping packages as well as site maintenance, are structured around early-contractor involvement to lock in constructability and schedule before final investment decisions. For project teams, this signals continued demand for integrated fabrication–construction delivery and long-term shutdown and upgrade support on major iron ore operations in Western Australia.

    Trapper target at Saga’s Radar project: grade and resource lens for mine planners
    Mining
    about 17 hours ago

    Trapper target at Saga’s Radar project: grade and resource lens for mine planners

    Initial drilling at Saga Metals’ Radar iron-titanium-vanadium project in Labrador has defined Trapper as its strongest target, with hole R-0009 cutting 296 m from 2.5 m depth grading 39.75% Fe₂O₃, 7.46% TiO₂ and 0.25% V₂O₅, including 63 m at 44% Fe₂O₃ and 9% TiO₂. A second hole, R-0008, returned 269.36 m at 36.21% Fe₂O₃, 6.57% TiO₂ and 0.244% V₂O₅ from 3.4 m, with internal intervals up to 46.15% Fe₂O₃ and 9.2% TiO₂. Saga reports Trapper’s iron and titanium grades are 124% and 105% higher than Hawkeye’s best assays, supporting a 15,000 m programme targeting an indicated resource later in 2026.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.