Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Contract Award

    Integra’s DeLamar project taps Ausenco: heap leach design lens for engineers

    June 2, 2026|

    Reviewed by Joe Ashwell

    Integra’s DeLamar project taps Ausenco: heap leach design lens for engineers

    First reported on International Mining – News

    30 Second Briefing

    Integra Resources has appointed Ausenco Engineering USA South as lead engineer for detailed engineering at the DeLamar gold-silver project in southwestern Idaho, with SLR Consulting retained for heap leach design, metallurgy and mine planning. The mandate covers advancing the project from feasibility-level concepts to construction-ready designs, including detailed layouts for heap leach pads, process plant and associated mine infrastructure. For engineers, the move signals imminent definition of pad geometry, liner and drainage systems, and materials handling circuits critical to permitting, capex control and construction sequencing.

    Technical Brief

    • Integration of process, heap leach and mine plans at this stage is critical for capex and opex trade-offs.

    Our Take

    Ausenco appears frequently in our Mining project coverage as lead engineer on North and South American gold and base metal builds, so its selection at DeLamar in Idaho signals Integra’s intent to package the project to bankable, internationally benchmarked design standards.

    Southwestern Idaho projects in our database often face close scrutiny on water management and visual impact; bringing in a firm like Ausenco early typically helps proponents pre-empt permitting and stakeholder concerns through tighter integration of process, tailings and infrastructure design.

    Among recent ‘Projects’ and ‘Contract Award’ items in the USA, there is a tilt toward brownfield or previously disturbed sites, and DeLamar’s location in a historic mining district in Idaho likely gives Integra a relative advantage in permitting compared with greenfield Western US projects.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Litus–UWin Nanotech critical minerals JV: flowsheet design notes for engineers
    Mining
    1 day ago

    Litus–UWin Nanotech critical minerals JV: flowsheet design notes for engineers

    Calgary-based Litus has signed a 25 May memorandum of understanding with Taiwan’s UWin Nanotech to jointly develop selective extraction, separation, recovery and purification flowsheets for cobalt, lithium, nickel and other elements from battery recycling and other secondary sources. The collaboration will combine Litus’ LiNC one-step direct lithium extraction platform for low- and high-concentration brines and its ReLiGN battery recycling process with UWin’s hydrometallurgical systems used in Apple-certified e‑waste and Li-ion recycling. Engineers should watch for integrated nanomaterial–hydromet circuits targeting both critical minerals and rare earth elements in circular supply chains.

    Gold price erases 2026 gains: cost-of-carry and project impacts for miners
    Mining
    1 day ago

    Gold price erases 2026 gains: cost-of-carry and project impacts for miners

    Gold fell as much as 3.5% to $4,315/oz, its lowest since March, erasing 2026 gains after a strong US May nonfarm payrolls print pushed Treasury yields and the dollar higher and lifted Fed rate hike odds. US gold futures dropped over 3.2% to $4,342/oz, with CME FedWatch now pricing about a 68% chance of a December hike versus roughly 50% pre-data. Since the Iran war began and the Strait of Hormuz closure drove energy prices up, bullion has slid nearly 18%, raising the cost of carry for non-yielding gold.

    Mining
    1 day ago

    Codelco’s El Teniente Copper & Moly Marks: ESG design notes for mine engineers

    Codelco’s El Teniente Division has secured both The Copper Mark and The Molybdenum Mark after a rigorous independent on-site assessment of its responsible production practices. The international assurance process verified that El Teniente’s policies and operational controls meet high environmental, social and governance criteria, including responsible mineral value chain management. For engineers and project teams, the dual certification signals that future brownfield expansions, tailings management and underground operations at this major Chilean copper–molybdenum complex will be scrutinised against these ESG benchmarks.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental