Geomechanics.io

  • Free Tools
Sign UpLog In

    Geomechanics.io

    Geomechanics, Streamlined.

    © 2026 Geomechanics.io. All rights reserved.

    Geomechanics.io

    CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

    Industries

    MiningConstructionTunnelling

    Company

    Terms of UsePrivacy PolicyLinkedIn
    Product
    Projects

    IMARC 2026 mining technology wave: integration takeaways for mine operators

    August 31, 2026|

    Reviewed by Tom Sullivan

    IMARC 2026 mining technology wave: integration takeaways for mine operators

    First reported on Australian Mining

    30 Second Briefing

    More than 500 mining technology and solutions providers will exhibit at IMARC 2026 in Sydney’s International Convention Centre from 27–29 October, with artificial intelligence, automation, data and productivity flagged as core themes. Organisers expect over 150 first-time exhibitors, signalling strong demand for tools such as autonomous haulage systems, AI-driven fleet optimisation and real-time orebody characterisation platforms. For mine operators, the event will be a concentrated test bed for integrating digital decision-support systems with existing plant control, short-interval control and remote operations centres.

    Technical Brief

    • More than 500 technology and solutions providers are confirmed, allowing direct benchmarking of competing OEM and software offerings.
    • Over 150 exhibitors will be first-time participants, expanding access to emerging vendors beyond established Tier‑1 suppliers.
    • Concentration of AI, automation and data vendors in one venue reduces evaluation travel time for multi-site operators.

    Our Take

    With more than 500 technology and solutions providers slated for IMARC 2026 in Sydney, operators can expect a dense concentration of AI, automation and data platforms that, in our database, increasingly target critical minerals supply chains highlighted in the 17 and 14 August IMARC previews.

    The Innovation & Investment Alley flagged in the 27 August related piece is likely to act as a filter for the 150-plus new exhibitors, giving Australian miners a practical route to pilot smaller, higher-risk technologies before rolling them across operating projects.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Mining
    about 1 hour ago

    Jennmar–Kemi Mine partnership: ground support implications for design engineers

    Jennmar has signed a long-term agreement with Outokumpu to supply ground control products to the Kemi Mine, Finland’s largest underground operation and Europe’s only active chrome mine. The deal covers strata support hardware for deep underground workings, where high-stress conditions and long development drives demand robust rock reinforcement systems. For geotechnical and mining engineers, the partnership signals continued investment in engineered support solutions at Kemi, with implications for bolt types, support patterns, and compatibility with Scandinavian ground support standards.

    Mining
    about 1 hour ago

    CrossBoundary’s Kamoa Copper solar PV‑BESS: reliability lessons for mine power engineers

    CrossBoundary Energy has brought a solar PV and battery energy storage system into commercial operation at Kamoa Copper S.A., delivering 30 MW of baseload solar power to what is described as Africa’s largest copper mining complex in the Democratic Republic of the Congo. The facility supports the joint venture between Ivanhoe Mines, Zijin Mining Group and the DRC government, reducing reliance on grid and diesel generation. For mine operators, the project shows large-scale PV‑plus‑BESS can reliably supply continuous process loads at tier‑one copper operations.

    Mining
    about 1 hour ago

    Central Tanami JV–Macmahon Groundrush decline: design and risk notes for mine planners

    Central Tanami Project Joint Venture has awarded Macmahon Underground a A$38 million contract to construct the Groundrush decline at the CTPJV gold mine site in the Northern Territory, Australia. The decline will provide new underground access beneath the existing Groundrush open pit, enabling future stoping and deeper resource development for JV owners Tanami Gold and MGX. For geotechnical and mine planners, the pact signals a shift from open pit to underground extraction, with associated requirements for decline ground support, ventilation and dewatering design.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental