Geomechanics.io

  • Free Tools
Sign UpLog In
Built byBoxcut Studio

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Op-Ed
    Standard/Guideline
    Sustainability

    Holcim UK’s call for mandatory EPDs: implications for project teams and specifiers

    November 21, 2025|

    Reviewed by Tom Sullivan

    Holcim UK’s call for mandatory EPDs: implications for project teams and specifiers

    First reported on The Construction Index

    30 Second Briefing

    Holcim UK’s readymix concrete division managing director Alastair Meyers is calling for environmental product declarations (EPDs) to be made a legal requirement on all UK construction projects, arguing they are essential to meeting national net zero targets and eliminating greenwashing. EPDs, which can report up to 37 indicators including carbon footprint, energy use and waste, are already widely used in Europe but remain voluntary in the UK. Meyers says mandatory EPDs would enable like-for-like material comparisons, standardise assessment frameworks, and notes Holcim can already generate digital, on‑demand EPDs across its UK operations.

    Technical Brief

    • Meyers stresses EPDs should be explicitly embedded in UK construction regulations and primary legislation, not guidance.
    • Live EPD data are framed as necessary to avoid design decisions based on assumptions or generic benchmarks.
    • Contractors are expected to use EPD datasets for like-for-like comparisons between competing material specifications.
    • Architects and specifiers are targeted as key users, employing EPD outputs to refine low‑carbon material selection.
    • For developers, EPD-backed specifications are positioned as evidence that schemes align with corporate sustainability agendas.

    Our Take

    Holcim UK’s call for mandatory cement EPDs comes as it expands its UK footprint via quarry and readymix acquisitions such as PJ Thory, meaning any future EPD requirement would increasingly apply across its vertically integrated aggregates-to-concrete chain.

    With EPDs allowing up to 37 indicators, mandatory disclosure in the UK and Europe would likely expose performance gaps between cement and concrete producers, putting pressure on operators with older, higher-emission plants in Holcim’s competitive set, including Heidelberg Materials and Hanson.

    Cement appears in only a handful of keyword-matched Policy pieces in our database, so a major producer like Holcim publicly backing mandatory EPDs signals that large incumbents now see regulated transparency as a competitive tool rather than just a compliance cost.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Conservatives to scrap Environment Agency and Natural England: risk lens for engineers
    Policy
    1 day ago

    Conservatives to scrap Environment Agency and Natural England: risk lens for engineers

    Conservative Party leaders are preparing an election pledge to abolish the Environment Agency and Natural England, removing the current statutory regulators for flood risk management, main river consents, environmental permits and protected habitats. Scrapping these bodies would affect technical approvals for flood defences, reservoir safety oversight, abstraction licences and environmental impact assessments on major road, rail and energy schemes. Engineers could face a restructured or entirely new permitting regime, with uncertainty over design standards, programme risk and long-term asset maintenance responsibilities.

    ORR cuts third party rail charges: project delivery implications for engineers
    Policy
    4 days ago

    ORR cuts third party rail charges: project delivery implications for engineers

    The Office of Rail and Road has reduced the charges that third parties pay to fund upgrades and maintenance on the UK rail network, aiming to cut project costs for developers and investors. Lower access and investment charges are expected to make it more viable for ports, freight terminals and property-led schemes to finance track, signalling and station enhancements tied to their own developments. For civil and rail engineers, the change could unlock more privately backed schemes and require closer early-stage coordination on asset standards, possession planning and long-term maintenance responsibilities.

    Space miners’ Earth-sized tax problem: policy design notes for project teams
    Policy
    5 days ago

    Space miners’ Earth-sized tax problem: policy design notes for project teams

    Space mining ventures could face a UN-style global tax regime, with Petr Zimčík of NEWTON University proposing a Space Resources Tax Authority linked to COPUOS and a three-stage levy: a small extraction fee, a larger tax at sale or consumption, and final settlement if material enters Earth markets. The core tax would target economic rent only after recovery of capital and operating costs, with thresholds set in a basket-based international accounting unit to neutralise inflation and currency swings. A fixed share of revenue would fund a Global Space Resource Dividend and a separate Global Development Fund, using population, development gaps and space-sector contributions to allocate proceeds without conferring property rights over celestial bodies.

    Related Industries & Products

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    QCDB-io

    Comprehensive quality control database for manufacturing, tunnelling, and civil construction with UCS testing, PSD analysis, and grout mix design management.

    AllGeotechnicalInfrastructureHazardsEnvironmental