Greenland Mines’ Skaergaard gallium–vanadium find: project and geotechnical notes
Reviewed by Tom Sullivan

First reported on MINING.com
30 Second Briefing
Greenland Mines has completed its 2026 field season at the Skaergaard project in southeast Greenland, identifying potential vanadium-bearing titanomagnetite, iron and gallium value streams alongside the existing palladium-platinum-gold system. The campaign delivered 4,480 m of HQ diamond core, more than 105 tonnes of bulk material from mapped and channel-sampled mineralised horizons, and Skaergaard now hosts 153.6 million indicated tonnes grading 1.53 g/t palladium, 0.65 g/t gold and 0.12 g/t platinum under S-K 1300. First mining-oriented geotechnical work, high-resolution terrain and geophysical datasets, and baseline environmental studies move the project towards metallurgical flowsheet and infrastructure design.
Technical Brief
- 4,480 m of large-diameter HQ diamond core provides sufficient material for metallurgical variability testing.
- Gallium is reported as occurring throughout mineralised horizons, implying potential for deposit-wide by-product recovery.
- Vanadium-bearing titanomagnetite and iron are being assessed as additional value streams to the PGE–Au system.
- Re-engineered resource criteria delivered a 36% grade uplift versus the 2022 estimate for indicated material.
Our Take
With Skaergaard now adding gallium and vanadium to its palladium–platinum–gold profile, Greenland Mines is effectively pairing a precious metals resource base with the critical-minerals narrative that underpinned the recent US–Denmark–Greenland security pact coverage in our database, which also highlighted vanadium and palladium as strategic inputs.
The 153.6 Mt indicated resource at Skaergaard, combined with the NdPr-focused Sarfartoq acquisition reported on 2 September 2026, positions Greenland Mines as one of the few Greenland operators in our coverage pursuing a dual track of large-scale precious metals and rare earth magnet materials in both East and West Greenland.
Greenland Mines’ exposure to aluminium and alumina processing through its stake in AnorTech, alongside the newly reported gallium and vanadium at Skaergaard, suggests a portfolio tilt towards supplying both light-weighting (aluminium) and advanced electronics/magnet materials, which could be attractive under the critical minerals frameworks referenced in recent Greenland policy pieces in our database.
Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.
Related Articles
Related Industries & Products
Mining
Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.
Construction
Quality control software for construction companies with material testing, batch tracking, and compliance management.
CMRR-io
Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.
HYDROGEO-io
Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.
GEODB-io
Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.


