Geomechanics.io

  • Free Tools
Sign UpLog In
Built byBoxcut Studio

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Contract Award

    Golding’s one-year Curragh mine extension: planning signals for mine engineers

    October 29, 2026|

    Reviewed by Joe Ashwell

    First reported on International Mining – News

    30 Second Briefing

    NRW Holdings’ subsidiary Golding Contractors has secured a one-year extension to its mining services contract at Coronado Global Resources’ Curragh coking coal mine near Blackwater, Queensland, valued at about A$200 million and commencing in January 2027. The deal locks in continued overburden removal, coal mining and haulage operations under the existing contract framework, giving both parties cost and workforce planning certainty into the next mine scheduling cycle. For contractors and suppliers, the extension signals stable demand for large-scale truck–shovel fleets and ancillary support services at Curragh through at least 2027.

    Technical Brief

    • Existing large truck–shovel fleets and ancillary plant can be amortised over a longer operating horizon.

    Our Take

    A one-year, A$200 million extension starting in 2027 at the Curragh mine signals that Coronado Global Resources is locking in medium-term mining services in Queensland, which likely reflects confidence in coal market visibility beyond the current contract horizon.

    For NRW Holdings’ Golding Contractors, a high-value extension at Curragh in Blackwater helps smooth order-book visibility into 2027, which can support retention of skilled fleets and crews in central Queensland where competition for experienced contractors remains strong in our coverage.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Mining
    about 2 hours ago

    Stratum AI at Simberi JORC resource: key modelling takeaways for geologists

    Artificial intelligence models from Toronto-based Stratum AI are now underpinning the publicly reported JORC mineral resource estimate for St Barbara’s operating Simberi gold mine in Papua New Guinea, in what is claimed as one of the first such applications globally. Developed jointly with Perth-based St Barbara, the models were used directly in resource estimation rather than as a parallel or shadow study. For geologists and resource modellers, this signals growing regulator and owner confidence in AI-derived domaining and grade interpolation workflows within formal reporting frameworks.

    Mining
    about 2 hours ago

    MINEXCHANGE 2027 SME Conference: technical programme highlights for mining engineers

    MINEXCHANGE 2027 SME Annual Conference & Expo will run from 28 February to 3 March 2027 at the Colorado Convention Center in Denver, bringing together thousands of mining professionals, students and suppliers. The event will feature more than 100 technical sessions spanning mine planning, drilling and blasting, mineral processing, tailings, automation and ESG. For engineers, it offers concentrated access to current practice, emerging technologies and peer case studies in a single venue-scale programme.

    Mining
    about 2 hours ago

    Obuasi’s fourth Gekko ILR in 2027: recovery and circuit impacts for metallurgists

    AngloGold Ashanti’s Obuasi gold mine in Ghana will commission a fourth Gekko InLine Leach Reactor (ILR) in 2027, expanding a circuit that already runs three ILRs alongside a BIOX® refractory ore treatment plant. The decision extends more than two decades of site experience with ILR technology, originally adopted at Obuasi in its early commercial rollout. Additional ILR capacity should increase gravity gold recovery from concentrates, reduce lock-up in the BIOX® circuit and give metallurgists more flexibility in treating variable high-sulphide ore.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental