Geomechanics.io

  • Free Tools
Sign UpLog In
Built byBoxcut Studio

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects

    Gold miners’ 23% valuation discount: project pipeline lens for engineers

    October 28, 2026|

    Reviewed by Joe Ashwell

    Gold miners’ 23% valuation discount: project pipeline lens for engineers

    First reported on MINING.com

    30 Second Briefing

    Senior gold producers are trading at 6.82x forecast 12‑month cash flow versus a five‑year average of 8.83x, a 23% discount, even as Haywood Securities keeps long‑term price assumptions at $4,000–4,500/oz gold and $55–65/oz silver. Haywood flags well‑funded M&A and project build‑outs, backing First Mining’s Springpole project in Ontario (federal EA already approved), Thesis Gold & Silver’s Lawyers‑Ranch feasibility by 2027 in BC’s Toodoggone district, and Troilus’s Quebec gold‑copper project with an $850 million credit‑approved debt commitment towards a $1.1‑billion package.

    Technical Brief

    • Haywood anticipates a near-term provincial EA decision for Springpole, critical for final mine design and financing.
    • Consolidation of Canadian development assets and strategic stakes by Centerra and AngloGold constrain alternative project options for acquirers.
    • Haywood’s unchanged gold and silver price decks follow Q3 realised averages of US$4,263/oz Au and US$62.71/oz Ag.
    • Q3 gold and silver prices exceeded Haywood’s Q4 assumptions, lifting 2026 annual averages to US$4,411/oz and US$69.04/oz respectively.

    Our Take

    Haywood Securities has been a recurring name in our database across both bullish and bearish cycles for gold and silver, and its current view that producers trade at a 23% discount to their five‑year cash‑flow multiple echoes its July 2026 forecast reset, signalling the firm is leaning on valuation compression rather than higher metal-price decks to justify buy ratings on names like First Mining, Thesis and Troilus.

    The sizeable US$1.1 billion planned debt package for Troilus Mining in Quebec, alongside Haywood’s aggressive target prices for Canadian developers such as First Mining and Thesis, suggests that in Canada-focused gold projects our coverage is seeing financing structures increasingly anchored in leverage and long‑dated price assumptions rather than near‑term equity strength.

    Porto Sudeste’s record 27.8 Mt iron ore throughput in Brazil in 2025, mentioned alongside gold and silver names, underlines that in our 1250 Mining stories database multi‑commodity logistics and port assets are becoming more visible in equity narratives, as traders like Trafigura and sovereign investors such as Mubadala seek optionality across both bulk (iron ore) and precious metals flows.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Mining
    about 2 hours ago

    BHP’s Basto performance pillars: integration and safety lens for mine engineers

    Edgar Basto, Chief Enterprise Performance Officer at BHP, is targeting the next wave of performance gains by combining the company’s existing operational expertise with new technology deployments and a group-wide safety programme, outlined at IMARC 2026 in Sydney. The enterprise-level approach centralises performance improvement across BHP’s portfolio rather than by individual asset, signalling more standardised operating systems, data architectures and decision-support tools across iron ore, copper and coal. For engineers and managers, this points to tighter integration of technology, process discipline and safety metrics in future project and operations planning.

    Anfield Energy’s Utah uranium mill approvals: design and licensing notes for engineers
    Mining
    about 2 hours ago

    Anfield Energy’s Utah uranium mill approvals: design and licensing notes for engineers

    Anfield Energy has received draft renewal documents for the radioactive materials licence and groundwater discharge permit for its Shootaring Canyon Mill in Garfield County, Utah, one of only three constructed conventional uranium mills in the US. The draft licence would cap production at 1,500 tonnes, or 3 million lb, of yellowcake per year and mandates a financial surety, a defined groundwater monitoring network, and best available technology standards for process ponds, the South Cell and decontamination pad. Anfield is stripping legacy mill equipment ahead of targeted licence renewal in Q2 2027, while its Velvet-Wood project holds 4.6 million lb eU3O8 measured and indicated plus 552,000 lb inferred.

    Perpetua Resources’ $40m US Army award: tungsten project lens for mine planners
    Mining
    about 2 hours ago

    Perpetua Resources’ $40m US Army award: tungsten project lens for mine planners

    Perpetua Resources has secured a 36‑month, US$40 million cost‑share award from the US Army’s Defense Ordnance Technology Consortium to evaluate tungsten concentrate production at the Stibnite gold‑antimony project in Idaho, with Perpetua matching the funding. The programme covers surface drilling to define a tungsten resource, metallurgical test work on a 550 kg sample grading 9.2% antimony and 4.2% tungsten, and design and permitting of an exploration decline beneath the Hangar Flats pit. Drilling to date has returned up to 9.8 m at 4.6% tungsten and 8.3% antimony, indicating potential high‑grade feed beneath existing gold–antimony resources.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental