Geomechanics.io

  • Free Tools
Sign UpLog In
Projects
Contract Award

GoGold’s $227M Los Ricos South mine: capex, returns and schedule for mine planners

June 9, 2026|

Reviewed by Joe Ashwell

GoGold’s $227M Los Ricos South mine: capex, returns and schedule for mine planners

First reported on MINING.com

30 Second Briefing

GoGold Resources has secured SEMARNAT approval to build the $227 million Los Ricos South bulk-tonnage underground gold-silver mine in Jalisco, with a 24‑month construction schedule and full funding from its C$261 million cash balance. The 15‑year operation is designed to produce 80 million oz silver-equivalent, averaging 7.3 million oz per year in the first five years, and carries a 2025 feasibility study after-tax NPV (5%) of $355 million and 28% IRR at $26.80/oz silver and $2,330/oz gold. Los Ricos South will join the Parral agglomerated heap leach tailings project and precedes potential development of the nearby Los Ricos North deposit.

Technical Brief

  • Initial capex of $227 million is complemented by a further $100 million sustaining capital requirement.
  • SEMARNAT approval covers all federal environmental permits needed for bulk-tonnage underground development at Los Ricos South.
  • Los Ricos property comprises 45 mining concessions over more than 240 km² in Jalisco.
  • Los Ricos North, 25 km from Los Ricos South, is currently defined only to PEA level.
  • Parral’s agglomerated heap leach in Chihuahua processes historic tailings for silver, gold and copper recovery.
  • Parral produced 394,605 oz silver-equivalent in the latest quarter, generating an additional $16 million cash.
  • GoGold’s cash balance of C$261 million underpins full equity funding of the Los Ricos South build.
  • Market reaction to permit approval saw GoGold’s share price rise over 10% to C$3.73, capitalising it at C$1.52 billion.

Our Take

SEMARNAT’s sign-off at Los Ricos South echoes its approval of Orla Mining’s Camino Rojo in Zacatecas, signalling that well-structured gold–silver open-pit projects in Mexico are still moving through federal permitting despite a tougher discourse on new mines.

The 15-year life and 80 Moz silver-equivalent profile at Los Ricos South, combined with the nearby Los Ricos North area, suggests GoGold is effectively building a district-scale gold–silver camp in Jalisco rather than a single-asset operation, which can materially change how larger producers view it as a future takeover or JV candidate.

Geotechnical Software for Modern Teams

Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

No credit card required.

  • Save and export unlimited calculations
  • Advanced data visualisation
  • Generate professional PDF reports
  • Cloud storage for all your projects

Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

Related Articles

Aeris Tritton copper reserve boost: mine planning and services lens for engineers
Mining
about 5 hours ago

Aeris Tritton copper reserve boost: mine planning and services lens for engineers

Aeris Resources has more than quadrupled the ore reserve at its Tritton copper operations in central New South Wales to 10 Mt at 1.7 per cent Cu and 0.38 g/t Au, securing over five years of mill feed for the existing processing plant. The enlarged reserve base underpins Aeris’ strategy for a long-life, multi-mine hub, giving planners clearer visibility on stope sequencing, backfill requirements and ventilation upgrades across multiple underground orebodies. For contractors and suppliers, the five-year runway signals sustained demand for ground support, pastefill, and mine services in the Tritton district.

AIC Mines appoints Glencore copper executive: project and flowsheet insights for engineers
Mining
about 5 hours ago

AIC Mines appoints Glencore copper executive: project and flowsheet insights for engineers

AIC Mines has appointed Clint Donkin, Glencore’s former head of copper for its Africa region and ex-chief technology officer for copper, as managing director and CEO of its North Queensland copper operations from 31 October. Donkin’s background includes overseeing multiple African copper assets and joint ventures within Glencore’s portfolio, giving him deep experience in large-scale sulphide operations, brownfield expansions and complex processing flowsheets. The move signals AIC’s intent to leverage tier-one copper operational and technology expertise as it advances production and potential growth projects in the region.

Geology-led ore behaviour modelling: key planning insights for mine engineers
Mining
about 5 hours ago

Geology-led ore behaviour modelling: key planning insights for mine engineers

Geology-led geometallurgical modelling is being used to predict ore behaviour beyond grade by integrating limited metallurgical testwork with geological domains to estimate recovery, hardness, deleterious elements and mineralogical variability at block-model scale. Tools such as Datamine’s Studio RM and Maptek’s Vulcan are combining drillhole assays, mineralogy and comminution indices (e.g. Bond ball mill work index) to generate 3D models of processing performance rather than just metal grade. For mine planners and process engineers, this enables earlier circuit design decisions, more realistic throughput forecasts and domain-specific blending strategies.

Related Industries & Products

Mining

Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

Construction

Quality control software for construction companies with material testing, batch tracking, and compliance management.

CMRR-io

Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

HYDROGEO-io

Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

GEODB-io

Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy