Geomechanics.io

  • Free Tools
Sign UpLog In

    Geomechanics.io

    Geomechanics, Streamlined.

    © 2026 Geomechanics.io. All rights reserved.

    Geomechanics.io

    CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

    Industries

    MiningConstructionTunnelling

    Company

    Terms of UsePrivacy PolicyLinkedIn
    Projects
    Contract Award

    GoGold’s $227M Los Ricos South mine: capex, returns and schedule for mine planners

    June 9, 2026|

    Reviewed by Joe Ashwell

    GoGold’s $227M Los Ricos South mine: capex, returns and schedule for mine planners

    First reported on MINING.com

    30 Second Briefing

    GoGold Resources has secured SEMARNAT approval to build the $227 million Los Ricos South bulk-tonnage underground gold-silver mine in Jalisco, with a 24‑month construction schedule and full funding from its C$261 million cash balance. The 15‑year operation is designed to produce 80 million oz silver-equivalent, averaging 7.3 million oz per year in the first five years, and carries a 2025 feasibility study after-tax NPV (5%) of $355 million and 28% IRR at $26.80/oz silver and $2,330/oz gold. Los Ricos South will join the Parral agglomerated heap leach tailings project and precedes potential development of the nearby Los Ricos North deposit.

    Technical Brief

    • Initial capex of $227 million is complemented by a further $100 million sustaining capital requirement.
    • SEMARNAT approval covers all federal environmental permits needed for bulk-tonnage underground development at Los Ricos South.
    • Los Ricos property comprises 45 mining concessions over more than 240 km² in Jalisco.
    • Los Ricos North, 25 km from Los Ricos South, is currently defined only to PEA level.
    • Parral’s agglomerated heap leach in Chihuahua processes historic tailings for silver, gold and copper recovery.
    • Parral produced 394,605 oz silver-equivalent in the latest quarter, generating an additional $16 million cash.
    • GoGold’s cash balance of C$261 million underpins full equity funding of the Los Ricos South build.
    • Market reaction to permit approval saw GoGold’s share price rise over 10% to C$3.73, capitalising it at C$1.52 billion.

    Our Take

    SEMARNAT’s sign-off at Los Ricos South echoes its approval of Orla Mining’s Camino Rojo in Zacatecas, signalling that well-structured gold–silver open-pit projects in Mexico are still moving through federal permitting despite a tougher discourse on new mines.

    The 15-year life and 80 Moz silver-equivalent profile at Los Ricos South, combined with the nearby Los Ricos North area, suggests GoGold is effectively building a district-scale gold–silver camp in Jalisco rather than a single-asset operation, which can materially change how larger producers view it as a future takeover or JV candidate.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    South32’s 61% Sierra Gorda reserve lift: life-of-mine and plant planning notes
    Mining
    about 12 hours ago

    South32’s 61% Sierra Gorda reserve lift: life-of-mine and plant planning notes

    South32 has lifted the Sierra Gorda ore reserve in Chile by 61% to 1.1 billion tonnes at 0.39% total copper, 0.016% molybdenum and 0.06 g/t gold (0.46% CuEq), extending reserve life by about five years to 2045 after 85,000 metres of infill drilling from 200 holes. The updated MRE now stands at 1.87 billion tonnes at 0.37% copper (0.44% CuEq), with the orebody remaining open at depth and additional potential at the Catabela Northeast target. A fourth grinding line, approved in July, is expected to lift copper output by roughly 30% from 2031, reinforcing long-term concentrator planning and infrastructure requirements.

    Agnico’s C$57M Radisson stake: O’Brien gold mine access and PEA lens for engineers
    Mining
    about 12 hours ago

    Agnico’s C$57M Radisson stake: O’Brien gold mine access and PEA lens for engineers

    Agnico Eagle Mines is investing C$57.2 million in Radisson Mining Resources for a 10.5%–14.9% stake to advance underground access and infrastructure at the historic O’Brien gold mine in Quebec’s Bousquet-Cadillac camp along the Larder Lake-Cadillac Break. Funding will support an access ramp, underground workings, surface facilities and water management, complementing Radisson’s fully funded 140,000-metre surface drilling and a planned 11-year underground operation with toll milling at IAMGOLD’s Doyon plant. A July 2025 PEA at US$3,300/oz gold pegs O’Brien’s after-tax NPV5 at C$871 million with a 74% IRR, underpinned by recent intercepts such as 5.1 m at 316.31 g/t from 823 m.

    Top of Mine: Costa’s AI-through-mining thesis and what it means for project teams
    Mining
    about 12 hours ago

    Top of Mine: Costa’s AI-through-mining thesis and what it means for project teams

    Otavio (Tavi) Costa, founder and CEO of Azuria Capital, argues that mining equities are currently the cheapest way to gain AI exposure, as sovereign funds and governments re-rate the sector and mid-tier producers move to secure “strategic reserves” by acquiring high-quality junior assets. He links this to a macro backdrop where global debt has returned to World War II levels but only about 3% of the US Treasury market is now backed by gold, versus roughly 50% then. With spot gold at $4,673.20/oz, Costa expects reserve depletion, weak discoveries and a “global monetary race towards gold” to drive prices substantially higher.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental