Geomechanics.io

  • Free Tools
Sign UpLog In
Built byBoxcut Studio

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Product

    FLSmidth–Crushing Equipment Africa deal: circuit design takeaways for mine engineers

    November 16, 2026|

    Reviewed by Tom Sullivan

    First reported on International Mining – News

    30 Second Briefing

    FLSmidth & Co. A/S has agreed to acquire 100% of Crushing Equipment Africa via its FLSmidth South Africa (Pty) Ltd subsidiary, expanding its installed base and service footprint in Southern Africa’s quarrying and mid-tier mining segment. The deal folds CE Africa’s compact jaw and cone crusher lines into FLSmidth’s portfolio, adding locally engineered machines suited to modular plants, mobile contractors and space-constrained sites. For regional operators, the move signals shorter spares lead times, stronger field service coverage and tighter integration between primary crushing, screening and downstream comminution circuits.

    Technical Brief

    • Transaction is a 100% share acquisition of Crushing Equipment Africa by FLSmidth South Africa (Pty) Ltd.
    • Deal explicitly targets strengthening of FLSmidth’s aftermarket offering in Southern Africa’s crushing segment.

    Our Take

    Taking full ownership of Crushing Equipment Africa gives FLSmidth & Co. A/S direct control over a compact crushing line that can be pushed into both greenfield and brownfield Projects, which in our database is where most Southern African equipment spend is currently concentrated.

    For contractors and mid-tier miners in Southern Africa, a locally anchored FLSmidth compact-crushing offering is likely to tighten competition with other modular plant suppliers, potentially shortening lead times and shifting some procurement away from imported, custom-built units.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    Cancel at any time.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Mining
    4 minutes ago

    Cornish Lithium–Marriott Drilling deal: geothermal well design notes for engineers

    Cornish Lithium has awarded Marriott Drilling a major contract for a two-well programme at the Cross Lanes Geothermal Lithium Project near Truro, with each well planned to reach about 2,000 m depth. Marriott will deploy specialist geothermal drilling services tailored to high-temperature, deep hard-rock conditions typical of Cornish granites. The wells are intended to access lithium-enriched geothermal brines, a key step towards assessing commercial extraction potential and informing future wellfield design.

    Mine camp drinking water plants: integrated UF–RO design notes for engineers
    Mining
    26 minutes ago

    Mine camp drinking water plants: integrated UF–RO design notes for engineers

    Containerised ultrafiltration and reverse-osmosis plants for remote mine camps only perform reliably when raw water quality, pre-treatment (including cartridge filtration and antiscalant dosing), recovery rates and disinfection are engineered as a single system rather than sized just for daily volume and container footprint, Victor Zhang writes. The piece stresses matching membrane selection and flux to variable borehole or surface sources, managing concentrate disposal from high-recovery RO, and designing for intermittent camp demand profiles. For operators, clear SOPs, remote monitoring and straightforward CIP procedures are flagged as critical to avoid fouling, microbiological failures and unplanned outages.

    Mining
    26 minutes ago

    LONGi Hi-MO 9 for Muswellbrook Solar Farm: power and load notes for miners

    LONGi will supply 135 MW AC / 176 MW DC of its Hi-MO 9 solar modules to the Muswellbrook Solar Farm and battery energy storage system (BESS) project in the Upper Hunter region of New South Wales, Australia. The utility-scale hybrid plant, located near the coal-dominated Muswellbrook mining hub, is designed to pair large-scale PV with grid-connected storage to stabilise output and support local load. For miners in the Hunter Valley, the project signals growing availability of firmed renewable power for electrified fleets, ventilation and processing loads.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental