Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Contract Award

    FLS Black Volta gold project package: flowsheet and schedule notes for engineers

    December 16, 2025|

    Reviewed by Joe Ashwell

    FLS Black Volta gold project package: flowsheet and schedule notes for engineers

    First reported on International Mining – News

    30 Second Briefing

    Azumah Resources Ghana Ltd has awarded FLS a DKK 235 million contract to supply all major equipment and main process technologies for the Black Volta gold project in Ghana, with the long-lead package booked in Q4. The scope covers core plant systems rather than discrete items, signalling a single-vendor flowsheet approach for crushing, grinding and gold recovery. For project engineers, this centralises process design responsibility with FLS and locks in key lead times for critical plant components.

    Technical Brief

    • Long-lead order includes both physical equipment and bundled technical support services from FLS.
    • Scope as “strategic technology partner” implies FLS involvement from flowsheet design through commissioning support.
    • Centralised supply reduces interface risk between crushing, grinding and gold-recovery OEMs during detailed design.
    • Single-vendor approach simplifies spares strategy and warehouse holdings for Azumah during ramp-up.
    • Early commitment to long-lead items is critical for schedule control on remote West African gold projects.

    Our Take

    Within our 321 Mining stories, West African gold projects like Black Volta feature prominently in the ‘Projects’ and ‘Contract Award’ tags, signalling that Ghana remains one of the more active jurisdictions for greenfield gold plant awards relative to other African regions.

    For FLS, a DKK 235 million process-plant order is consistent with the mid-range project scale seen in our database, suggesting Black Volta is being engineered as a conventional, capital-disciplined gold operation rather than a mega-project.

    Our recent gold coverage shows more references to AI and digital optimisation in processing circuits; a full-process package award to FLS at Black Volta likely positions the project to integrate these tools more easily through a single OEM’s control and data environment.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Scope Systems cyber attack: resilience and risk lessons for mining IT teams
    Mining
    about 6 hours ago

    Scope Systems cyber attack: resilience and risk lessons for mining IT teams

    A ransomware attack on Perth-based Scope Systems’ Pronto Xi ERP cloud stack disrupted dozens of mining customers, including Northern Star Resources and Evolution Mining, in what MM‑ISAC’s Rob Labbe calls the broadest single third‑party cyber event the sector has seen. Scope says client servers were restored from backups and not directly accessed, but admits internal data was exfiltrated and has not disclosed the attack vector, raising questions about visibility at hypervisor, storage and backup layers. The incident spotlights how multi‑tenant vCenter/ESXi environments, VM cloning and snapshot abuse—already used by groups like Akira—could expose integrated exploration, production and maintenance data across more than 400 Pronto Xi‑reliant mining operations.

    Newmont’s Red Chris underground expansion: block cave design and capex notes for engineers
    Mining
    about 6 hours ago

    Newmont’s Red Chris underground expansion: block cave design and capex notes for engineers

    Newmont’s Red Chris mine in British Columbia has secured an amended Environmental Assessment Certificate and Mines Act permit, allowing a shift from open-pit to underground block caving and extending operations into the mid-2040s. The copper-gold porphyry deposit in the Golden Triangle hosts an estimated 20 million oz of gold and 13 billion lb of copper, with the block cave expected to lift Canada’s copper output by about 15%. The project entails several billion dollars in capital, around 1,800 construction jobs and roughly 1,500 operating roles at peak.

    Goldman cuts gold price forecast to US$4,900: planning notes for mine projects
    Mining
    about 6 hours ago

    Goldman cuts gold price forecast to US$4,900: planning notes for mine projects

    Goldman Sachs has cut its end‑2026 gold price forecast by US$500/oz to US$4,900/oz after the US Federal Reserve, under new chair Kevin Warsh, signalled a hawkish shift that has pushed market-implied December rate hike odds to 87%. Spot gold has already fallen to about US$4,100/oz, down 27% from its near‑US$5,600/oz January peak, with three consecutive monthly losses between March and May and a 4% year‑to‑date decline. Goldman warns a 2026 year‑end target as low as US$4,400/oz is possible if rates rise, partly offset by ongoing central‑bank buying of roughly 50 tonnes/month this year and 40 tonnes/month next year.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy