Geomechanics.io

  • Free Tools
Sign UpLog In
Built byBoxcut Studio

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Sustainability

    EY mining risks and opportunities for 2027: key takeaways for project teams

    October 29, 2026|

    Reviewed by Tom Sullivan

    EY mining risks and opportunities for 2027: key takeaways for project teams

    First reported on Australian Mining

    30 Second Briefing

    Operational complexity remains mining’s top business risk for 2027 in EY’s latest global survey of 400 senior mining and metals executives, driven by fragile supply chains and increasingly selective capital markets that threaten continuity of production. Respondents point to logistics bottlenecks, contractor availability and energy price volatility as key stressors on multi-site portfolios and complex processing chains. EY notes that capital is now favouring projects with clear decarbonisation pathways and disciplined cost control, pushing miners to simplify operating models and prioritise brownfield optimisation over high-risk greenfield growth.

    Technical Brief

    • Operational complexity is treated as a composite risk, bundling mine-to-port logistics, processing chains and portfolio integration.
    • Supply chain disruption is framed around critical spares, reagents and mobile fleet availability rather than just export logistics.
    • Capital market selectivity is linked to project screening criteria that now explicitly weight decarbonisation pathways and ESG disclosure.
    • EY notes that cost inflation in labour, energy and consumables is eroding traditional economies of scale in multi-site operations.
    • Contractors’ availability is identified as a constraint on both sustaining capital works and major brownfield debottlenecking programmes.
    • For similar portfolios, the analysis implies higher value in modular plant designs and simplified flowsheets that reduce inter-site dependencies.

    Our Take

    With 400 senior mining and metals executives feeding into EY’s 2027 risk horizon, this survey will likely shape how Australian operators prioritise capital for water, safety and productivity tech already highlighted in our coverage of Xylem’s water-scarcity solutions and Aptella’s real-time risk controls.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Mining
    about 2 hours ago

    Stratum AI at Simberi JORC resource: key modelling takeaways for geologists

    Artificial intelligence models from Toronto-based Stratum AI are now underpinning the publicly reported JORC mineral resource estimate for St Barbara’s operating Simberi gold mine in Papua New Guinea, in what is claimed as one of the first such applications globally. Developed jointly with Perth-based St Barbara, the models were used directly in resource estimation rather than as a parallel or shadow study. For geologists and resource modellers, this signals growing regulator and owner confidence in AI-derived domaining and grade interpolation workflows within formal reporting frameworks.

    Mining
    about 2 hours ago

    MINEXCHANGE 2027 SME Conference: technical programme highlights for mining engineers

    MINEXCHANGE 2027 SME Annual Conference & Expo will run from 28 February to 3 March 2027 at the Colorado Convention Center in Denver, bringing together thousands of mining professionals, students and suppliers. The event will feature more than 100 technical sessions spanning mine planning, drilling and blasting, mineral processing, tailings, automation and ESG. For engineers, it offers concentrated access to current practice, emerging technologies and peer case studies in a single venue-scale programme.

    Mining
    about 2 hours ago

    Obuasi’s fourth Gekko ILR in 2027: recovery and circuit impacts for metallurgists

    AngloGold Ashanti’s Obuasi gold mine in Ghana will commission a fourth Gekko InLine Leach Reactor (ILR) in 2027, expanding a circuit that already runs three ILRs alongside a BIOX® refractory ore treatment plant. The decision extends more than two decades of site experience with ILR technology, originally adopted at Obuasi in its early commercial rollout. Additional ILR capacity should increase gravity gold recovery from concentrates, reduce lock-up in the BIOX® circuit and give metallurgists more flexibility in treating variable high-sulphide ore.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental