Geomechanics.io

  • Free Tools
Sign UpLog In
Built byBoxcut Studio

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Contract Award

    Eiffage’s LanWin2 HVDC win: multi-country jacket delivery lens for engineers

    November 17, 2026|

    Reviewed by Joe Ashwell

    Eiffage’s LanWin2 HVDC win: multi-country jacket delivery lens for engineers

    First reported on The Construction Index

    30 Second Briefing

    Eiffage’s Belgian subsidiary Smulders has secured a subcontract from Dragados Offshore to fabricate the jacket foundation for TenneT’s LanWin2 HVDC converter platform in the German North Sea, designed to transmit 2GW—double the power of earlier onshore links. Jacket fabrication will be split across Smulders’ Belgian and Polish facilities, with final assembly and load-out in the Netherlands, signalling a multi-country fabrication and logistics chain. Construction is due to start in early 2027, with offshore load-out targeted for 2030.

    Technical Brief

    • Jacket foundation is for the LanWin beta offshore HVDC converter platform in the German North Sea.
    • Converter platform forms part of TenneT’s offshore grid linking North Sea wind farms to onshore grids.
    • Dragados Offshore remains main contractor, with Smulders operating as specialist jacket subcontractor.

    Our Take

    Eiffage’s role on LanWin2 adds a major offshore HVDC converter to a portfolio that, in our database, is otherwise dominated by large terrestrial transport schemes such as HS2 and Grand Paris Express, signalling a deliberate push into North Sea grid infrastructure work.

    For TenneT, a 2 GW LanWin beta converter in the German North Sea aligns with its multi-country offshore build-out, and the long 2027–2030 delivery window suggests fabrication yards in Belgium, the Netherlands and possibly Poland will need to lock in heavy-lift and high-voltage component capacity early.

    Smulders’ appearance here alongside its turbine work on ScottishPower Renewables’ East Anglia Two project indicates the fabricator is becoming a recurring supplier for complex offshore topsides, which may give it leverage on pricing and schedule in future North Sea converter tenders.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    Cancel at any time.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Strabag’s Pfaffensteig Tunnel contract: design and delivery notes for rail engineers
    Infrastructure
    6 months ago

    Strabag’s Pfaffensteig Tunnel contract: design and delivery notes for rail engineers

    Strabag and Group company Züblin have secured the design-and-build structural works for the ABS Gäubahn Nord/Pfaffensteig Tunnel in south-west Germany, centred on an 11km twin-bore rail tunnel linking Stuttgart Airport station directly to the Gäubahn line towards Switzerland. About 9.8km will be driven by two TBMs, with conventional tunnelling for the A8 motorway undercrossing and airport connection, plus a 240m cut-and-cover section, retaining structures, railway underpasses and a grade-separated crossing. A 3km surface section will be upgraded and partially realigned for 200km/h operation, delivered under an integrated project delivery model with Ed. Züblin, Wayss & Freytag and Strabag AG sharing tunnelling, structural and earthworks packages.

    National Grid TBM under the Thames: tunnelling design and risk notes for engineers
    Infrastructure
    8 months ago

    National Grid TBM under the Thames: tunnelling design and risk notes for engineers

    A 271.5‑tonne Herrenknecht Mixshield TBM, Caroline, has started driving a 2.2km electricity cable tunnel with a 4m internal diameter beneath the River Thames in Essex for National Grid’s Grain to Tilbury project, delivered by the Ferrovial BEMO joint venture. The drive will pass through variable Thames estuary ground conditions between 35m‑deep launch and reception shafts of 15m and 12m diameter, with tunnelling continuing into 2026 and overall scheme completion targeted for 2029. The new tunnel will replace the 1969 Thames Cable Tunnel and carry new high‑voltage circuits between Grain and Tilbury substations.

    Panama Canal Mixshield undercrossing: design and tunnelling lessons for engineers
    Infrastructure
    9 months ago

    Panama Canal Mixshield undercrossing: design and tunnelling lessons for engineers

    A 13.46m diameter Herrenknecht Mixshield TBM has broken through into the future Balboa station on Panama Metro Line 3 after completing the first-ever TBM undercrossing of the Panama Canal at depths exceeding 60m below sea level. The 5,600kW, 26,616kNm machine, fitted with an accessible cutterhead and more than 4,500 sensors linked via the Herrenknecht.Connected platform, has achieved peak advance of 150 segment rings (about 300m) per month through mixed sandstone, tuff, breccias and basalt. Around 1.5km of the 4.5km twin-track tunnel remains to final breakthrough.

    Related Industries & Products

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    QCDB-io

    Comprehensive quality control database for manufacturing, tunnelling, and civil construction with UCS testing, PSD analysis, and grout mix design management.

    AllGeotechnicalInfrastructureHazardsEnvironmental