Geomechanics.io

  • Free Tools
Sign UpLog In
Built byBoxcut Studio

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Sustainability

    DryFlow Magnetics ARENA-backed dry plant: design and power notes for mine engineers

    October 26, 2026|

    Reviewed by Joe Ashwell

    First reported on International Mining – News

    30 Second Briefing

    DryFlow Magnetics has secured up to A$48.4 million from the Australian Renewable Energy Agency’s Future Made in Australia Innovation Fund to build a first-of-a-kind dry magnetite upgrading demonstration plant in South Australia. The 1.5 Mt/y facility will convert magnetite iron ore into high‑purity iron using a dry beneficiation flowsheet, eliminating process water and associated tailings dams. For process and project engineers, the key questions will centre on ore feed specification, power demand versus wet circuits, and integration with existing crushing and screening infrastructure.

    Technical Brief

    • ARENA’s Future Made in Australia Innovation Fund grant is capped at A$48.4 million for the demo.
    • Dry upgrading route removes conventional thickening/clarification, pumps and pipelines from the flowsheet.
    • Elimination of tailings dams shifts geotechnical focus to dry rejects stockpiles and dust control.
    • Power demand will be dominated by comminution and magnetic separation rather than slurry pumping.
    • High-purity iron product is likely targeted at DRI/EAF supply chains needing low-gangue feed.
    • Similar dry flowsheets could de-risk magnetite projects in arid regions with constrained water licences.

    Our Take

    ARENA’s backing of both DryFlow Magnetics and Element Zero’s Green Iron Electroreduction Demonstration suggests the agency is deliberately building a portfolio of complementary low‑carbon iron technologies in Australia, spanning ore upgrading through to alternative ironmaking.

    A 1.5 Mt/y dry magnetite upgrading plant in South Australia positions the state as a test bed for high‑purity iron feedstock for green steel, which could materially change the cost and water‑use profile of future magnetite developments in the region.

    Within our 73 keyword‑matched iron ore pieces, relatively few focus on dry beneficiation; this funding signals that dry processing routes for magnetite are now moving from niche R&D into pre‑commercial demonstration scale in Australia.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Mining
    about 1 hour ago

    Metso Media Pumping System in Suzhou: safety and wear insights for mill engineers

    Metso has staged a three-day live demonstration in Suzhou, China, of its mobile Media Pumping System (MPS) for HIGmill™ and SMD fine grinding applications, drawing customers and media suppliers from multiple countries. The MPS is designed to automate and simplify grinding media handling and transfer, replacing manual loading with pumped media circulation between storage and mills. For plant engineers, the system targets reduced liner damage risk, more controlled media addition rates, and lower manual handling exposure around vertical stirred mills.

    Mining
    about 1 hour ago

    Evolution Mining–Caterpillar emissions partnership: design notes for mine planners

    Evolution Mining is partnering with Caterpillar to pursue practical emissions reductions across its operations, focusing on low‑carbon mobile equipment and site‑specific decarbonisation planning rather than offsets. The collaboration centres on building internal capability in fleet electrification, alternative fuels and energy‑efficient haulage, with Caterpillar providing technology roadmaps and performance data for next‑generation trucks and loaders. For mine planners and engineers, this signals closer OEM–operator integration on power demand modelling, mine layout for electric fleets, and staged replacement of diesel assets.

    Telfer cash flows and Havieron: funding strategy insights for mine planners
    Mining
    about 2 hours ago

    Telfer cash flows and Havieron: funding strategy insights for mine planners

    Greatland Resources’ September-quarter results show the Telfer gold–copper operation in Western Australia generated $289 million in operating cash flow, cementing its role as the funding base for the nearby Havieron development. The company is simultaneously investing in sustaining capital at Telfer and advancing Havieron, a high-grade gold–copper deposit located about 45km away in the Paterson Province. For mine planners and project financiers, the update signals a strategy of using mature Telfer cash flows to de-risk Havieron’s construction and ramp-up profile.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental