Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Product
    Safety

    Donaldson SSG+ air cleaner: dust control and uptime gains for mine fleets

    March 31, 2026|

    Reviewed by Joe Ashwell

    Donaldson SSG+ air cleaner: dust control and uptime gains for mine fleets

    First reported on Australian Mining

    30 Second Briefing

    Donaldson Filtration Solutions has launched the SSG+ Donaclone air cleaner, a high‑capacity pre-cleaner and filter unit designed for heavy-duty mining engines operating in extreme dust loads. The system combines axial seal primary elements with Donaclone pre-cleaner tubes to eject a large proportion of coarse dust before it reaches the filter media, extending service intervals on haul trucks, loaders and drills. For mine maintenance teams, the unit targets reduced unplanned downtime, more stable engine performance and lower filter consumption in high‑particulate pit and haul road environments.

    Technical Brief

    • SSG+ Donaclone uses inertial separation tubes to spin out large particulates before filtration.
    • Axial seal primary elements are cartridge-style, enabling faster, tool-free change-outs in confined engine bays.
    • Housing is designed for vertical or horizontal mounting, suiting cramped engine compartments on large mobile plant.
    • Reduced dust ingress is intended to stabilise air–fuel ratios, limiting derates and exhaust temperature excursions.
    • By limiting manual filter handling frequency, exposure to respirable dust for maintenance crews is reduced.
    • Similar multi-stage dry-air cleaners are increasingly specified in mine safety management plans for critical production fleets.

    Our Take

    Recent Australian Mining coverage of XCMG’s battery-electric trucks and Kal Tire/Decoda’s haul-road hazard detection shows mobile equipment OEMs and service providers converging on health and safety performance, suggesting Donaldson’s air cleaner will likely be evaluated alongside digital and low-emission upgrades in whole-of-fleet risk programmes.

    For Australian operators grappling with supply-chain delays highlighted in the MASPRO article, a filtration product that reduces dust ingress into engines and cabins can indirectly cut unplanned downtime by extending component life and service intervals, which is increasingly being factored into total cost-of-ownership models rather than treated as a standalone safety spend.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Graphite One Alaska–Ohio supply chain: design and capex notes for mine planners
    Mining
    about 2 hours ago

    Graphite One Alaska–Ohio supply chain: design and capex notes for mine planners

    Graphite One has secured a Conneaut, Ohio site from Bessemer and Lake Erie Railroad (CN subsidiary) for its Active Anode Materials facility, gaining direct Lake Erie port access, multi-line CN rail, an on-site substation and room to scale. The staged build-out targets an initial 25,000‑tonne module, ultimately 100,000 tonnes per year of anode material, supplied by the post‑feasibility Graphite Creek deposit in Alaska with a planned 20‑year mine life and backed by up to US$2 billion in potential EXIM funding. A separate Ohio finishing and blending plant aims for Q4 2027 completion with 10,000 t/y initial capacity, split into 4,000 t energy storage, 3,000 t fast‑charging and 3,000 t high‑energy‑density graphite products for lithium‑ion batteries.

    Jeff Currie’s $10,000 gold call: cycle, capex and price risks for mine planners
    Mining
    about 9 hours ago

    Jeff Currie’s $10,000 gold call: cycle, capex and price risks for mine planners

    Gold may retreat from about $4,500/oz. towards $4,000/oz. as Jeffrey Currie, former Goldman Sachs commodities chief and now Abaxx Markets executive co-chairman, stays tactically short, citing forced central bank sales such as Turkey’s roughly 120 tonnes of disposals to fund higher energy costs. Currie still targets a long-term move towards $10,000/oz., arguing that once central banks turn dovish after an energy-driven growth shock, the trade “resets”. He links this to a broader commodity super cycle driven by capex starvation and an estimated $820 billion of 2026 spending by the “Magnificent 7 plus Oracle”.

    Nouveau Monde Graphite Matawinie mine: project and supply-chain notes for engineers
    Mining
    about 9 hours ago

    Nouveau Monde Graphite Matawinie mine: project and supply-chain notes for engineers

    Construction has begun on Nouveau Monde Graphite’s C$2 billion Matawinie mine in Québec, fast-tracked through Canada’s Major Projects Office and designed to produce up to 106,000 tonnes of graphite per year, which would make it the largest graphite mine in the G7. Ottawa has backed the project with financing from Export Development Canada, the Canada Infrastructure Bank and the Canada Growth Fund, plus a seven-year offtake for 30,000 tonnes of concentrate annually. The mine, 120 km north of Montreal, is expected to create over 1,000 jobs and anchor an integrated graphite-to-battery materials chain with NMG’s planned Bécancour plant.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental