Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Research

    Curtin–Victory rare earths partnership: geometallurgy insights for project teams

    March 17, 2026|

    Reviewed by Joe Ashwell

    Curtin–Victory rare earths partnership: geometallurgy insights for project teams

    First reported on Australian Mining

    30 Second Briefing

    Curtin University and Victory Metals have formed an “industry–academia powerhouse” partnership to accelerate development of Victory’s rare earths project in Western Australia, combining Curtin’s Western Australian School of Mines expertise with the company’s exploration and processing plans. The collaboration will focus on metallurgical testwork, process flowsheet optimisation and resource characterisation to improve recovery of rare earth elements from the project’s ore. For mining engineers and metallurgists, the tie-up signals early integration of research-grade mineral processing and geometallurgy into project design rather than post-feasibility optimisation.

    Technical Brief

    • Partnership centres on Curtin’s WA School of Mines providing laboratory-scale metallurgical and geochemical testwork.
    • Victory Metals will supply project drill core and bulk samples for systematic characterisation and bench-scale processing trials.
    • Research methods are expected to include mineralogical analysis, leach testing and flowsheet variability studies across ore domains.
    • Data generated will feed directly into Victory’s process design criteria, plant sizing assumptions and reagent selection.
    • Curtin’s team will focus on refining separation and purification steps specific to the project’s rare earth mineralogy.
    • Collaboration structure allows rapid iteration between lab results and Victory’s ongoing exploration and resource modelling.
    • Outputs are intended for early-stage design and pilot-scale planning rather than full commercial plant optimisation.

    Our Take

    Victory Metals’ recent work at the North Stanmore rare earths project in Western Australia – including a resource upgrade via a new flotation flowsheet and confirmation of a hafnium by-product – suggests the Curtin University collaboration is likely to focus on optimising processing of clay-hosted and heavy rare earth elements rather than just exploration geology.

    Curtin University already features in our mining coverage for advanced geochronology and mineral systems research (for zircon and lithium systems), so its involvement here signals that Victory Metals may gain access to higher-end analytical tools and modelling that can shorten testwork cycles and de-risk flowsheet design.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Trilogy’s Arctic project FAST-41 entry: permitting and schedule notes for mine planners
    Mining
    about 14 hours ago

    Trilogy’s Arctic project FAST-41 entry: permitting and schedule notes for mine planners

    Trilogy Metals’ Arctic copper-zinc project in Alaska’s Ambler Mining District has been accepted into the US federal FAST-41 permitting programme, shortly after filing its Clean Water Act Section 404 application with the US Army Corps of Engineers. The 50/50 joint venture with South32 covers an indicated 35.7 million tonnes grading 2.98% copper and 4.09% zinc, with a 2023 technical report outlining a 13-year mine producing 149 million lb. Cu and 173 million lb. Zn per year plus lead, gold and silver. TD Securities forecasts construction could start in 2029 with first production in 2031, while the nearby Bornite deposit could extend district copper output beyond 30 years.

    MAX Power Mining–Moose Jaw hydrogen MOU: subsurface and capex notes for engineers
    Mining
    2 days ago

    MAX Power Mining–Moose Jaw hydrogen MOU: subsurface and capex notes for engineers

    MAX Power Mining has signed an MOU with the City of Moose Jaw, Saskatchewan, to advance natural hydrogen commercialisation in the Regina–Moose Jaw Industrial Corridor, centred on the Lawson Natural Hydrogen system near Central Butte, about 80 km northwest of the city. Core desorption tests from nine samples in Cambrian Basal sands above the Basement Complex discovery returned helium values up to 8.7%, averaging 4.4%, indicating a potentially valuable hydrogen–helium system. The partners aim to leverage existing regional infrastructure and policy support to move the project towards commercial validation.

    Water shortages and mining projects: schedule and design takeaways for engineers
    Mining
    2 days ago

    Water shortages and mining projects: schedule and design takeaways for engineers

    Water scarcity and multi‑year permitting delays—often two to four years for discharge and dewatering approvals in the western US—are increasingly stalling otherwise bankable mines, with water risk now affecting project schedules, financing and national credit profiles. Consultants such as Woodard & Curran report that “credible water stories” are becoming as critical as ore grades, pushing operators towards closed‑loop recycling and non‑traditional sources. US firms Genesis Systems and Atoco are deploying atmospheric water generation units, including Genesis’ containerised WaterCube systems producing over 1,000 gallons per day off‑grid, now trialled at mine sites.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental