Geomechanics.io

  • Free Tools
Sign UpLog In
Built byBoxcut Studio

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects

    Continuous cutting in hard rock: utilisation and ground control notes for mines

    November 17, 2026|

    Reviewed by Joe Ashwell

    First reported on International Mining – News

    30 Second Briefing

    Continuous hard-rock cutting is moving from trial scale to serious metres, with miners pushing roadheaders, undercutting machines and disc cutters into longhole stopes, development drives and caving fronts. OEMs are pairing high-powered cutter heads with real-time ground monitoring, vibration control and adaptive cutting modes to manage variable UCS rock and minimise overbreak compared with drill-and-blast. For geotechnical and production teams, the key questions are machine utilisation per heading, ground support sequencing around continuous faces, and integration with existing load–haul–dump fleets.

    Technical Brief

    • Feature focuses on hard-rock continuous cutting deployments achieving substantial advance metres rather than short trials.

    Our Take

    International Mining also appears in recent coverage of IMARC and critical minerals, suggesting this continuous cutting feature is likely framed against automation, AI and supply-chain themes that are front-of-mind for conference audiences.

    The link to Sandvik’s global postgraduate mining engineering programme, where International Mining is again involved, signals that continuous cutting concepts are increasingly being pushed not just in operations but into formal training pipelines for future mine planners and engineers.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    Cancel at any time.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Mining
    about 1 hour ago

    Wabtec Digital Mine Gen 3 CAS TRL4: deployment and integration notes for engineers

    Wabtec Digital Mine’s Generation 3 Collision Avoidance System has passed Technology Readiness Level 4 testing for surface Collision Warning and Avoidance Devices, following independent verification by VDG Solutions at Enterprises University of Pretoria. The TRL4 programme, run under the Mining Industry Occupational Safety initiative, validates hardware and software performance of CxD units in realistic mine operating scenarios. Successful TRL4 completion signals that CAS Gen 3 is technically mature enough for broader surface deployment and integration into mine mobile equipment fleets.

    Mining
    about 1 hour ago

    Cambrian College–Eaton underground BEV charger: utilisation and power notes for mines

    Cambrian College has secured C$300,000 over two years from the Canadian federal government to develop the country’s first mobile high‑power charging system for underground battery-electric mining vehicles. Working with Eaton, the team will design a rugged, skid-mounted unit that can be relocated within mine workings rather than relying on fixed charging bays. The project directly targets constraints on BEV deployment in deep and expanding mines, where flexible power distribution and rapid charging are critical for equipment utilisation and ventilation planning.

    Mining
    about 1 hour ago

    Carmeuse’s autonomous Cat 777 fleet: haul road design lessons for quarry engineers

    Carmeuse has partnered with Caterpillar to deploy one of the first autonomous Cat 777 haul truck fleets in a quarry environment at its Drummond Island limestone operation in northern Michigan, and the first of its kind on a continuous operation with a long-haul route. The project applies Cat autonomous haulage to 90 t‑class 777 trucks rather than ultra-class fleets, targeting consistent cycle times and reduced operator exposure on extended quarry hauls. For geotechnical and mine planners, the move signals growing interest in automating mid-size truck fleets on fixed, long-distance quarry haul roads.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental