Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Sustainability

    Codelco–Valora Más tyre alliance: REP compliance notes for mine operators

    September 15, 2026|

    Reviewed by Tom Sullivan

    First reported on International Mining – News

    30 Second Briefing

    Codelco has signed a strategic agreement with Chilean collective management system Valora Más to recover category A end-of-life tyres, defined as units with rim diameters under 57 inches used on light vehicles and support fleets across its operations. The alliance focuses on optimising collection, traceability and recycling logistics for these ELTs under Chile’s REP (Extended Producer Responsibility) framework, complementing existing in-pit and plant waste streams. For mine operators, the move signals tighter compliance expectations on tyre segregation, storage design and contracted recycling capacity for small and medium-sized tyres, not just ultra-class haul truck tyres.

    Technical Brief

    • Integration with existing in-pit and plant waste streams will require updated internal procedures and contractor interfaces.
    • Similar REP-style schemes in other jurisdictions could impose comparable data, storage and recovery obligations on mine sites.

    Our Take

    Codelco’s tyre recovery alliance with Valora Más sits alongside its move to 100% electromobility at the Ventanas Division, signalling that the state miner is now targeting both mobile equipment emissions and downstream waste streams in its sustainability projects coverage.

    With Chile processing only a small share of its copper concentrates domestically, as highlighted in recent smelting utilisation analysis involving Codelco and Cochilco, higher-profile waste and recycling initiatives such as end-of-life tyre recovery can help bolster Codelco’s ESG narrative even while its core processing footprint remains constrained.

    The 57‑inch rim diameter threshold for Category A end-of-life tyres implies a focus on the larger haulage and support fleet; in our database, similar large-tyre recovery schemes have often been a precursor to broader circular-economy contracts covering conveyor belts, liners and other high-volume consumables at major copper operations.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Milford Mining $25M Utah expansion: throughput and plant upgrade notes for engineers
    Mining
    about 3 hours ago

    Milford Mining $25M Utah expansion: throughput and plant upgrade notes for engineers

    Milford Mining Company Utah has secured a conditional US$25 million, 16.5‑year USDA Rural Development loan guarantee, privately financed via Magnolia Bank, to expand its fully permitted copper mining and processing complex in Beaver County. The investment targets modernisation of processing equipment, removal of bottlenecks and capacity upgrades to double copper cathode and concentrate throughput by end‑2027 across the 62,000‑acre property, which also hosts tungsten, antimony and rare earth elements. MMCU expects to add about 100 jobs to its current 180‑strong workforce in rural Utah.

    Nifty leaching returns after 17 years: heap rehab and SX–EW notes for engineers
    Mining
    about 3 hours ago

    Nifty leaching returns after 17 years: heap rehab and SX–EW notes for engineers

    Cyprium Metals has restarted acid leaching at the Nifty copper complex in Western Australia for the first time since 2009, commissioning existing heaps with acid solution and targeting first copper cathode in the December 2026 quarter. Refurbishment of the site’s solvent extraction and electrowinning (SX–EW) plant is progressing in parallel, enabling a return to on-site cathode production rather than concentrate export. For engineers, the restart centres on rehabilitating legacy heap leach infrastructure and integrating it with an upgraded SX–EW circuit after a 17‑year leach hiatus.

    Ramelius–Primero Mt Magnet expansion: throughput and scheduling notes for mine planners
    Mining
    about 3 hours ago

    Ramelius–Primero Mt Magnet expansion: throughput and scheduling notes for mine planners

    Ramelius Resources has awarded Primero Group the Mt Magnet expansion project in Western Australia, adding 3Mtpa of processing capacity to support its target of 500,000oz of gold production per year by FY30. The EPC-style contract, announced by parent company NRW Holdings, centres on upgrading the existing Mt Magnet plant rather than building a greenfield facility, leveraging current infrastructure and power. For mine planners and process engineers, the uplift in nameplate throughput will drive revised pit schedules, ore blending strategies and potential debottlenecking of crushing and grinding circuits.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental