Codelco’s $866m Gabriela Mistral extension: design and water shift notes for mine engineers
Reviewed by Joe Ashwell

First reported on MINING.com
30 Second Briefing
Codelco has secured unanimous environmental approval from Antofagasta’s Coeva for its $868 million Operational Continuity and Water Transition Gabriela Mistral Mining Project, extending the open-pit mine’s life by 28 years from 2028 to 2055 while keeping copper cathode output near current levels. The 30‑year project plan shifts the operation off registered groundwater wells from year nine and introduces sodium chloride into leach processing from 2035 to sustain heap leach performance under alternative water regimes. Construction will average 230 workers, rising to about 1,200 during operations, though potential appeals to Chile’s Committee of Ministers and environmental courts could delay execution.
Technical Brief
- Transition away from registered groundwater wells is scheduled from year nine, implying new make-up water infrastructure.
- Construction phase averages 230 personnel, ramping to about 1,200 during steady-state operations.
- Environmental Impact Study was filed in December 2024 and has now secured a favourable RCA from Coeva.
- Coeva’s unanimous approval in Antofagasta reduces regulatory risk but leaves scope for ministerial and court appeals.
Our Take
In our database, Codelco’s Gabriela Mistral and the $870 million Tovaku copper project in Antofagasta both sit in the ‘Projects’ stream, signalling that the company is doubling down on long‑life cathode capacity in northern Chile even as its group copper output has been trending down in recent years.
The 2028–2055 operating window at Gabriela Mistral overlaps with Codelco’s current push into battery‑electric loading at El Teniente, suggesting that any future fleet renewals at this remote division will be judged against the same decarbonisation and productivity benchmarks now being trialled underground.
The planned shift to sodium chloride processing from 2035 aligns with several other low‑grade copper items in our coverage that use chloride leaching to stretch heap‑leach resources, which typically lowers fresh‑water demand but can tighten requirements on materials handling and corrosion management for operators.
Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.
Related Articles
Related Industries & Products
Mining
Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.
Construction
Quality control software for construction companies with material testing, batch tracking, and compliance management.
CMRR-io
Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.
HYDROGEO-io
Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.
GEODB-io
Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.


