Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy
    Projects
    Contract Award

    Civmec’s A$400m BHP and Fortescue awards: delivery and ECI notes for project teams

    January 6, 2026|

    Reviewed by Tom Sullivan

    Civmec’s A$400m BHP and Fortescue awards: delivery and ECI notes for project teams

    First reported on International Mining – News

    30 Second Briefing

    Civmec has secured more than A$400 million in new contracts and extensions with BHP and Fortescue, converting a previously flagged pipeline of brownfield and sustaining capital opportunities into firm work. The awards, spanning structural, mechanical and piping packages as well as site maintenance, are structured around early-contractor involvement to lock in constructability and schedule before final investment decisions. For project teams, this signals continued demand for integrated fabrication–construction delivery and long-term shutdown and upgrade support on major iron ore operations in Western Australia.

    Technical Brief

    • Brownfield nature implies complex tie-ins, constrained shutdown windows and detailed interface management with live plant.
    • Long-term maintenance extensions suggest multi-year shutdown, refurbishment and debottlenecking programmes rather than one-off campaigns.
    • Early-contractor involvement model enables Civmec to influence construction sequencing and modularisation strategies pre-FID.
    • Work mix supports utilisation of heavy-lift, modular assembly and large-scale pre-assembly yards to reduce site hours.
    • For other brownfield projects, similar SMP–maintenance bundling could streamline procurement and contractor mobilisation.

    Our Take

    BHP features heavily across our recent Mining coverage, from copper growth at Olympic Dam to legal fallout at Samarco, so Civmec’s new work with BHP suggests the contractor is tying into a client with both expanding project pipelines and complex legacy risk profiles.

    With BHP and Fortescue both active in large-scale iron ore and energy‑transition metals, Civmec’s contract wins position it as a key Tier 1 contractor likely to benefit as these majors advance brownfield expansions rather than greenfield builds highlighted in other copper‑focused projects in our database.

    In our 482 Mining stories, BHP is one of the most recurrent majors alongside Rio Tinto and Glencore, so Civmec’s alignment with both BHP and Fortescue strengthens its visibility in the same project ecosystem that is driving much of the current capex in our Projects and Contract Award tagged pieces.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Iltani’s Orient silver–indium project: 2025 drilling and mine design takeaways
    Mining
    about 5 hours ago

    Iltani’s Orient silver–indium project: 2025 drilling and mine design takeaways

    Iltani Resources’ Orient project in North Queensland, billed as one of Australia’s largest silver–indium developments, has reported standout 2025 drilling results that support a potential resource expansion. The polymetallic system targets silver, indium, zinc and lead, with recent intercepts extending known mineralisation along strike and at depth beyond the current drilling grid. Iltani is now planning follow-up step-out drilling and updated resource modelling, which could materially influence mine design, metallurgical testwork priorities and long-term development options for the Orient tenements.

    Silica, gold and rare earths exploration: pit design and schedule notes for planners
    Mining
    about 5 hours ago

    Silica, gold and rare earths exploration: pit design and schedule notes for planners

    Australian explorers are advancing silica sand, gold and rare earths projects, with silica gaining attention as a feedstock for solar glass and high‑purity industrial applications. Activity is concentrating in Western Australia and Queensland, where juniors are drilling shallow, laterally extensive sand deposits and following up high‑grade gold intercepts near existing processing hubs. For geotechs and mine planners, the focus on near‑surface, free‑digging sand bodies and brownfield gold step‑outs points to relatively low strip ratios, simpler pit designs and faster development timelines than deeper hard‑rock projects.

    Clarks Gully standout intercept: underground design notes for Hillgrove teams
    Mining
    about 6 hours ago

    Clarks Gully standout intercept: underground design notes for Hillgrove teams

    Recent diamond drilling at Larvotto Resources’ Clarks Gully prospect within the Hillgrove gold–antimony project in New South Wales has returned a “standout intercept”, strengthening the case for higher-grade underground mineralisation. The work forms part of a targeted diamond programme testing extensions of known lodes beneath historical workings at Hillgrove, a past producer with multiple steeply dipping, narrow-vein structures. For geotechnical and mine planning teams, the results point to continued focus on underground access, ground support in vein-hosted systems, and potential sequencing of gold–antimony stopes.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.