Geomechanics.io

  • Free Tools
Sign UpLog In
Built byBoxcut Studio

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Contract Award

    CBRE’s $1bn Onnec acquisition: data centre infrastructure lens for engineers

    October 21, 2026|

    Reviewed by Joe Ashwell

    CBRE’s $1bn Onnec acquisition: data centre infrastructure lens for engineers

    First reported on The Construction Index

    30 Second Briefing

    CBRE is acquiring London-based data centre infrastructure specialist Onnec for about $1bn, comprising £460m ($610m) in upfront cash and an earnout of up to £300m ($400m), with completion expected around year-end subject to approvals. Onnec, which designs, deploys and maintains network, fibre and data centre infrastructure for hyperscalers across the UK, continental Europe and Asia Pacific, is projected to deliver roughly £370m ($498m) revenue and over £50m ($67m) core EBITDA in 2027. The 800-strong business will sit within CBRE’s critical infrastructure services line, which CBRE targets to reach nearly $4.5bn revenue in 2027.

    Technical Brief

    • Onnec’s scope covers full lifecycle network, fibre and data centre infrastructure design, deployment and maintenance.
    • Around 800 employees provide installation and maintenance capacity across multiple concurrent hyperscale data centre programmes.
    • Operational footprint spans the UK, continental Europe and Asia Pacific, complementing CBRE’s existing US data centre work.
    • Onnec’s portfolio includes campus-scale data centre infrastructure, such as the Offenbach, Germany facility referenced.

    Our Take

    CBRE already features in our infrastructure coverage for advisory and facilities management roles in the UK (for example the Glasgow city centre growth fund work and the University of Hertfordshire FM contract), so acquiring Onnec signals a push to own more of the technical delivery capability around critical infrastructure rather than just advise on it.

    The multi‑year earnout structure tied to Onnec’s 2027 revenue and core EBITDA targets suggests CBRE is using performance-based consideration to manage integration risk in higher-growth segments like data centres, a pattern that is relatively uncommon in the more traditional project and contract awards that dominate our 915 Infrastructure stories.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Strabag’s Pfaffensteig Tunnel contract: design and delivery notes for rail engineers
    Infrastructure
    5 months ago

    Strabag’s Pfaffensteig Tunnel contract: design and delivery notes for rail engineers

    Strabag and Group company Züblin have secured the design-and-build structural works for the ABS Gäubahn Nord/Pfaffensteig Tunnel in south-west Germany, centred on an 11km twin-bore rail tunnel linking Stuttgart Airport station directly to the Gäubahn line towards Switzerland. About 9.8km will be driven by two TBMs, with conventional tunnelling for the A8 motorway undercrossing and airport connection, plus a 240m cut-and-cover section, retaining structures, railway underpasses and a grade-separated crossing. A 3km surface section will be upgraded and partially realigned for 200km/h operation, delivered under an integrated project delivery model with Ed. Züblin, Wayss & Freytag and Strabag AG sharing tunnelling, structural and earthworks packages.

    National Grid TBM under the Thames: tunnelling design and risk notes for engineers
    Infrastructure
    7 months ago

    National Grid TBM under the Thames: tunnelling design and risk notes for engineers

    A 271.5‑tonne Herrenknecht Mixshield TBM, Caroline, has started driving a 2.2km electricity cable tunnel with a 4m internal diameter beneath the River Thames in Essex for National Grid’s Grain to Tilbury project, delivered by the Ferrovial BEMO joint venture. The drive will pass through variable Thames estuary ground conditions between 35m‑deep launch and reception shafts of 15m and 12m diameter, with tunnelling continuing into 2026 and overall scheme completion targeted for 2029. The new tunnel will replace the 1969 Thames Cable Tunnel and carry new high‑voltage circuits between Grain and Tilbury substations.

    Panama Canal Mixshield undercrossing: design and tunnelling lessons for engineers
    Infrastructure
    8 months ago

    Panama Canal Mixshield undercrossing: design and tunnelling lessons for engineers

    A 13.46m diameter Herrenknecht Mixshield TBM has broken through into the future Balboa station on Panama Metro Line 3 after completing the first-ever TBM undercrossing of the Panama Canal at depths exceeding 60m below sea level. The 5,600kW, 26,616kNm machine, fitted with an accessible cutterhead and more than 4,500 sensors linked via the Herrenknecht.Connected platform, has achieved peak advance of 150 segment rings (about 300m) per month through mixed sandstone, tuff, breccias and basalt. Around 1.5km of the 4.5km twin-track tunnel remains to final breakthrough.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental