Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy
    Product
    Projects

    CAPS modular nitrogen and air: on-site utilities in practice for mine engineers

    March 23, 2026|

    Reviewed by Joe Ashwell

    CAPS modular nitrogen and air: on-site utilities in practice for mine engineers

    First reported on Australian Mining

    30 Second Briefing

    CAPS Australia is deploying modular nitrogen generators and compressed air systems from global OEM partners to support underground mining maintenance in Australian operations. The skid-mounted nitrogen units are engineered to match site-specific pressure, purity and flow requirements for tasks such as tyre inflation, longwall equipment servicing and inerting, reducing reliance on delivered gas cylinders. For mine operators, the key shift is towards on-site, containerised utilities that can be scaled or relocated between declines and workshops as production layouts change.

    Technical Brief

    • Skid-mounted nitrogen packages are paired with matching compressed air systems from the same CAPS fleet.
    • Units are containerised for cranage between portals, declines and surface workshops without reassembly.
    • CAPS integrates global OEM membranes and PSA modules into Australian-certified electrical and pressure-vessel packages.
    • Control systems are configured for underground use, with mine-spec isolators, emergency stops and gas monitoring interfaces.
    • Packages are designed to tie into existing mine air reticulation, avoiding new fixed pipework runs.
    • CAPS provides lifecycle support, including membrane replacement, compressor overhauls and periodic pressure-vessel inspections.
    • Standardised modular footprints allow mines to add parallel units for redundancy or higher seasonal demand.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Ascension’s deep-underground critical minerals tech: process insights for mine planners
    Mining
    about 13 hours ago

    Ascension’s deep-underground critical minerals tech: process insights for mine planners

    Oxford University spinout Ascension has raised £1.7 million in new funding, combining a £670,490 Innovate UK Growth Catalyst grant with £1 million from UKI2S, Oxford Science Enterprises and East X, bringing total capital raised to £6.2 million. The company’s Selective Recovery programme targets rare earths and other critical minerals in deep volcanic glass, aiming to separate metals in situ and cut surface processing stages. Ascension’s process uses natural geothermal heat in volcanic rock deposits, avoiding excavation, high-temperature surface processing and associated land disturbance.

    Mining
    about 15 hours ago

    Holcim UK’s 20 LiuGong 870HE loaders: quarry power and layout implications for engineers

    Holcim UK is deploying 20 LiuGong 870HE pure electric wheel loaders across its quarry fleet, expanding one of the highest-tonnage battery-electric loader deployments in the sector. The 870HE units, among the largest pure electric loaders currently available, are targeted at high-duty quarry loading cycles traditionally dominated by diesel machines. For geotechnical and quarry operators, this signals accelerating adoption of heavy battery-electric equipment for primary load-and-haul, with implications for power supply design, charging infrastructure layout and ventilation requirements in future pit and plant planning.

    Gold price nears month high: planning implications for mine project teams
    Mining
    about 15 hours ago

    Gold price nears month high: planning implications for mine project teams

    Gold jumped 1.7% to about $4,887/oz, its highest level since 17 March, after Iran reopened the Strait of Hormuz, restoring commercial traffic through a corridor that carries roughly 20% of global oil flows. Silver climbed more than 5% to $83/oz, a five-week high, as easing energy-price and inflation fears revived expectations of interest rate cuts that favour non-yielding assets. Analysts at Zaner Metals and MKS PAMP see scope for a move back towards $5,000/oz in the near term, while Goldman Sachs keeps a bullish $5,400/oz year-end target.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Tunnelling

    Specialised solutions for tunnelling projects including grout mix design, hydrogeological analysis, and quality control.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.