Geomechanics.io

  • Free Tools
Sign UpLog In

    Geomechanics.io

    Geomechanics, Streamlined.

    © 2026 Geomechanics.io. All rights reserved.

    Geomechanics.io

    CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

    Industries

    MiningConstructionTunnelling

    Company

    Terms of UsePrivacy PolicyLinkedIn
    Projects
    Sustainability

    Caddick completes Leeds logistics centre: fabric-first design notes for engineers

    September 18, 2026|

    Reviewed by Joe Ashwell

    Caddick completes Leeds logistics centre: fabric-first design notes for engineers

    First reported on The Construction Index

    30 Second Briefing

    Caddick has completed T45, a new urban logistics scheme on the A63 in Leeds, delivering 23 industrial units ranging from 4,490 sq ft to 32,635 sq ft for developer Chancerygate. All units achieve EPC A, with rooftop PV panels, air source heat pumps, high-performance insulated cladding and roofing, LED lighting, electric vehicle charging points and electric loading doors aimed at cutting operational energy demand. The project also adds fitted office and kitchen space plus landscaped communal and external wellbeing areas, with biodiversity planting integrated into the hardstanding layout.

    Technical Brief

    • T45 delivers 23 separate industrial units handed over as a single logistics estate package.
    • The scheme fronts the A63 corridor in Leeds, targeting urban logistics and last‑mile distribution.
    • Unit floorplates span from 4,490 sq ft to 32,635 sq ft, enabling multi‑tenant size flexibility.
    • Caddick acted as contractor delivering for developer Chancerygate under an ongoing multi‑project relationship.
    • T45 is Caddick’s fourth Chancerygate scheme, following Gateway 44, Mersey Reach and Novus.
    • Gateway 44 in Carlisle comprised a £4.5m logistics hub plus a Costa Coffee drive‑thru.
    • Mersey Reach in Aintree was a £7.8m industrial development, indicating similar mid‑scale logistics typology.
    • The Novus scheme at Knutsford delivered nine industrial units with a reported project value of £10.7m.

    Our Take

    Caddick’s recent workload in our database spans logistics (T45, Gateway 44, Mersey Reach, Novus), residential (St Martin’s Court in Lancaster) and mixed-use schemes (Bicycle Works in Wolverhampton), signalling a contractor positioning itself as a multi-sector regional player rather than a pure industrial specialist.

    With steel erection at Farington Park and the Big Yellow Self Storage build in Newcastle also in play, Caddick’s industrial and storage pipeline across the UK points to a strong internal knowledge base in shed/logistics typologies that can be leveraged for future Leeds‑area work around the A63 corridor.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Strabag’s Pfaffensteig Tunnel contract: design and delivery notes for rail engineers
    Infrastructure
    4 months ago

    Strabag’s Pfaffensteig Tunnel contract: design and delivery notes for rail engineers

    Strabag and Group company Züblin have secured the design-and-build structural works for the ABS Gäubahn Nord/Pfaffensteig Tunnel in south-west Germany, centred on an 11km twin-bore rail tunnel linking Stuttgart Airport station directly to the Gäubahn line towards Switzerland. About 9.8km will be driven by two TBMs, with conventional tunnelling for the A8 motorway undercrossing and airport connection, plus a 240m cut-and-cover section, retaining structures, railway underpasses and a grade-separated crossing. A 3km surface section will be upgraded and partially realigned for 200km/h operation, delivered under an integrated project delivery model with Ed. Züblin, Wayss & Freytag and Strabag AG sharing tunnelling, structural and earthworks packages.

    National Grid TBM under the Thames: tunnelling design and risk notes for engineers
    Infrastructure
    6 months ago

    National Grid TBM under the Thames: tunnelling design and risk notes for engineers

    A 271.5‑tonne Herrenknecht Mixshield TBM, Caroline, has started driving a 2.2km electricity cable tunnel with a 4m internal diameter beneath the River Thames in Essex for National Grid’s Grain to Tilbury project, delivered by the Ferrovial BEMO joint venture. The drive will pass through variable Thames estuary ground conditions between 35m‑deep launch and reception shafts of 15m and 12m diameter, with tunnelling continuing into 2026 and overall scheme completion targeted for 2029. The new tunnel will replace the 1969 Thames Cable Tunnel and carry new high‑voltage circuits between Grain and Tilbury substations.

    Panama Canal Mixshield undercrossing: design and tunnelling lessons for engineers
    Infrastructure
    7 months ago

    Panama Canal Mixshield undercrossing: design and tunnelling lessons for engineers

    A 13.46m diameter Herrenknecht Mixshield TBM has broken through into the future Balboa station on Panama Metro Line 3 after completing the first-ever TBM undercrossing of the Panama Canal at depths exceeding 60m below sea level. The 5,600kW, 26,616kNm machine, fitted with an accessible cutterhead and more than 4,500 sensors linked via the Herrenknecht.Connected platform, has achieved peak advance of 150 segment rings (about 300m) per month through mixed sandstone, tuff, breccias and basalt. Around 1.5km of the 4.5km twin-track tunnel remains to final breakthrough.

    Related Industries & Products

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental