Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Simplified.

© 2025 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy
    Projects
    Contract Award

    Brightstar’s new lode at Laverton: processing insights for mine planners

    December 2, 2025|

    Reviewed by Joe Ashwell

    Brightstar’s new lode at Laverton: processing insights for mine planners

    First reported on Australian Mining

    30 Second Briefing

    Brightstar Resources has completed its largest-ever processing campaign at the Laverton gold operations in Western Australia, driven by a new high-grade lode feeding the existing CIL plant. The campaign used toll treatment at a nearby third-party mill to run multiple ore parcels from the Cork Tree Well and Menzies projects, validating haulage, blending and metallurgical performance at commercial scale. Results will feed directly into Brightstar’s Laverton restart study, influencing pit designs, plant throughput assumptions and mine scheduling for the planned standalone processing facility.

    Technical Brief

    • For other junior mining developers, such toll campaigns provide de-risking of logistics and metallurgy before committing capex.

    Our Take

    Western Australia dominates our Mining project coverage, so a processing uplift at Brightstar Resources’ Laverton operations signals competitive pressure on nearby gold and nickel plants that are chasing similar mill utilisation gains.

    Among the 281 Projects/Contract Award pieces in our database, most WA items centre on either new plant builds or major refurbishments; a record processing boost from a new lode at Laverton instead points to operators extracting more value from existing circuits before committing to large capex.

    Laverton operations sit in a mature mining belt where haul distances and ore blending options are critical levers, so a new lode feeding the plant likely improves both grade control and scheduling flexibility compared with trucking from more distant satellite pits.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Northern Star gold hubs: deep extensions and design takeaways for mine planners
    Mining
    about 9 hours ago

    Northern Star gold hubs: deep extensions and design takeaways for mine planners

    Northern Star Resources reports strong exploration results across its Australian hubs, with deep extensions and high‑grade gold intercepts at operations including Kalgoorlie Consolidated Gold Mines in Western Australia. Drilling has identified mineralisation continuing at depth beneath existing workings, with multiple emerging zones that could support life‑of‑mine extensions and higher‑grade feed to existing mills. For mine planners and geotechs, the focus now shifts to underground access design, ground support in deeper stress regimes, and sequencing to integrate new stopes into current production.

    Regis WA exploration pipeline: mine life and design takeaways for planners
    Mining
    about 9 hours ago

    Regis WA exploration pipeline: mine life and design takeaways for planners

    Regis Resources is flagging a “significant pipeline” of near-mine and regional exploration targets across its Duketon and Tropicana gold operations in Western Australia, aiming to extend mine life and lift mill feed quality. The company is focusing on brownfields drilling around existing open pits and underground workings, plus greenfields prospects along under-tested shear zones within its Duketon belt and the Tropicana joint venture corridor. For geotechs and mine planners, the message is to expect ongoing resource definition drilling, updated pit shells and potential underground studies rather than major new project footprints.

    Harmony Eva copper project: Metso contract design implications for mine engineers
    Mining
    about 9 hours ago

    Harmony Eva copper project: Metso contract design implications for mine engineers

    Harmony Gold has advanced its Eva copper project in Queensland by awarding Metso a major equipment contract as the greenfield mine moves towards site construction. The deal covers key comminution and processing plant components, with Metso to supply crushing and grinding equipment sized for large-scale copper throughput at one of Australia’s biggest planned copper developments. The contract signals design lock-in for the process flowsheet and allows detailed engineering, foundation design and construction scheduling to proceed on a firmer basis.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.