Bridgewater Road Bridge, Queen Elizabeth Park: design and delivery notes for engineers
Reviewed by Tom Sullivan

First reported on New Civil Engineer
30 Second Briefing
A £19M “technically complex” footbridge, the Bridgewater Road Bridge, has opened in Queen Elizabeth Olympic Park, delivered by Kilnbridge for the London Legacy Development Corporation and developer Ballymore. Spanning a key waterway and rail corridor to connect new housing with the park, the structure had to be built under tight clearance constraints and live operational conditions. The scheme signals further densification of the Stratford waterfront area, with foundations and approach works likely to govern future utility diversions and adjacent plot layouts.
Technical Brief
- Completion was formally marked on 14 May by Kilnbridge, LLDC and Ballymore representatives.
Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.
Related Articles
Related Industries & Products
Construction
Quality control software for construction companies with material testing, batch tracking, and compliance management.
Mining
Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.
CMRR-io
Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.
HYDROGEO-io
Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.
GEODB-io
Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.


