Geomechanics.io

  • Free Tools
Sign UpLog In
Built byBoxcut Studio

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Contract Award

    Black Cat $35m FY2027 drilling: resource upgrade impacts for mine planners

    September 30, 2026|

    Reviewed by Tom Sullivan

    Black Cat $35m FY2027 drilling: resource upgrade impacts for mine planners

    First reported on Australian Mining

    30 Second Briefing

    Black Cat Syndicate has budgeted up to $35 million for exploration and resource conversion drilling in FY2027 to grow resources and extend mine lives at its Paulsens and Kal East gold operations in Western Australia. The company is targeting conversion of about 814koz of inferred resources, focusing on near-mine drilling to upgrade ounces into higher-confidence categories. For geotechs and mine planners, the spend signals continued underground and open-pit definition drilling, with potential redesign of stopes, pit shells and scheduling if significant portions of the inferred inventory are upgraded.

    Technical Brief

    • Concentrated drilling in existing operations suggests use of established underground drill cuddies and existing pit access for platforms.
    • Conversion drilling around current workings will likely tighten geotechnical domains and refine stope and pit wall assumptions.

    Our Take

    In our database, Black Cat Syndicate’s recent work at Trojan and the Lynx discovery at Paulsens both point to successful step‑out drilling in Western Australia, so a larger 2027 exploration budget is likely aimed at fast‑tracking similar footprint extensions and higher‑grade targets across Paulsens and Kal East.

    The 814koz of inferred resources flagged here, together with the separate $11m Coyote drilling campaign reported in May 2026, suggest Black Cat is deliberately building a multi‑asset gold inventory in Western Australia to support future mill‑feed flexibility rather than relying on a single cornerstone mine.

    Macmahon’s 12‑month underground mining services extension at the Majestic operation indicates Black Cat already has established contractor relationships in Western Australia, which should reduce execution risk when converting part of the current inferred gold inventory into mineable reserves by or beyond the 2027 financial year.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Mining
    about 1 hour ago

    Liebherr R 9150 at Hammerstone’s Muskeg Quarry: fleet and productivity notes for engineers

    Liebherr-Canada has delivered a new 150-tonne-class R 9150 excavator to Hammerstone Infrastructure Materials, bringing the fleet of this model at Muskeg Quarry in Alberta to three units. All three R 9150s are deployed at Muskeg Quarry, one of Western Canada’s largest limestone operations supplying high-quality aggregates to the oil sands sector. The additional machine signals continued high-volume production requirements and reinforces demand for large-class hydraulic excavators in regional aggregate supply chains.

    Mining
    about 1 hour ago

    GTK’s Roxia Smart Filter Press 470 units: dewatering insights for process engineers

    Geological Survey of Finland (GTK) has purchased two Roxia Smart Filter Press (SFP) units for the GTK Mintec pilot plant in Outokumpu to advance mineral processing and filtration research for mining and circular economy flowsheets. The installation includes the compact SFP 470 model, which offers fully automatic pressure filtration with integrated IIoT-based monitoring and control. For process engineers, the move provides an industrial-scale testbed to optimise dewatering performance, cake quality and water recovery before full-scale plant adoption.

    Mining
    about 1 hour ago

    Metso 4 MW slurry pump test rig in Sala: performance insights for mine designers

    Metso has commissioned a 4 MW extra-large slurry pump test rig at its Test and Training Center in Sala, Sweden, expanding full‑scale product development and performance verification for high-capacity pumps. The facility, described as among the largest slurry pump test rigs globally, allows controlled testing of large-duty units under realistic flow, head and solids-loading conditions. For mine operators and designers, this should provide more reliable hydraulic data, improved wear-life validation and better sizing guidance for demanding mill discharge and tailings applications.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental