Geomechanics.io

  • Free Tools
Sign UpLog In
Built byBoxcut Studio

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Contract Award

    Barrick’s 15-year North Mara licences: output, AISC and expansion lens for engineers

    October 6, 2026|

    Reviewed by Tom Sullivan

    Barrick’s 15-year North Mara licences: output, AISC and expansion lens for engineers

    First reported on MINING.com

    30 Second Briefing

    Tanzania has renewed Barrick’s two special mining licences for the North Mara gold mine for 15 years, securing tenure for the combined open-pit/underground operation that produced 249,000 attributable oz. last year and holds 43 Mt of proven and probable reserves at 2.32 g/t for 3.2 Moz. Barrick must lift output from 68,000 oz. in H1 to 132,000–162,000 oz. in H2 to meet 2026 guidance of 200,000–230,000 oz. at targeted AISC of US$1,520–US$1,680/oz., while studying debottlenecking and expansion of the North Mara–Bulyanhulu complex.

    Technical Brief

    • North Mara operates as a combined open-pit and underground mine, 540 km northwest of Dodoma.
    • Ownership structure fixed at 84% Barrick, 16% free-carried interest held by the Tanzanian state.
    • Twiga Minerals remains the management vehicle for North Mara–Bulyanhulu, with a 50:50 economic benefits split.
    • Barrick’s settlement with Tanzania in 2019–2020 included a US$300 million payment to regularise operations.
    • Tanzanian operations have contributed about US$5.3 billion since 2019, including US$1.2 billion in 2025 alone.
    • First-half attributable production dropped 47% year-on-year to 68,000 oz, driven partly by lower ore grades.
    • All-in sustaining costs escalated 79% year-on-year to US$2,283/oz, before any debottlenecking or expansion upgrades.

    Our Take

    With North Mara’s 15‑year licence in Tanzania and the planned spin‑off of a “North American Barrick” vehicle holding Nevada and Pueblo Viejo assets (11 May 2026 piece), Barrick is effectively locking in long‑dated African cash flow while signalling to investors that future valuation upside may be concentrated in a separate, regionally focused entity.

    The 47% output decline and 79% AISC increase at the North Mara–Bulyanhulu complex put pressure on Barrick’s cost profile just as TD Cowen has been flagging production growth and valuation gaps as key catalysts for the company in its “Canada Best Ideas” list (22 September 2026), suggesting operational delivery in Tanzania will be closely watched as part of that thesis.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Advanced Navigation Alabama expansion: PNT design and supply insights for mine engineers
    Mining
    about 2 hours ago

    Advanced Navigation Alabama expansion: PNT design and supply insights for mine engineers

    Advanced Navigation America is expanding manufacturing in Huntsville, Alabama, to build a Positioning, Navigation, and Timing (PNT) Centre of Excellence for high‑precision mining navigation, funded by a US$110 million Series C round. The facility will develop and produce deep‑tech systems including fibre‑optic and MEMS inertial sensors, laser and photonic navigation, vision‑based systems, AI, and quantum sensing for autonomous equipment operating in deep, dark, GPS‑denied mines. A trilateral production footprint across the US, Australia and the UK is intended to improve supply chain redundancy and shorten lead times for North American mining projects.

    Westwin Elements’ $502M Mississippi nickel refinery: project and process notes for engineers
    Mining
    about 2 hours ago

    Westwin Elements’ $502M Mississippi nickel refinery: project and process notes for engineers

    Westwin Elements will invest $502 million over five years to build a commercial-scale Class 1 nickel refinery at the Belwood Industrial Site in Natchez, Mississippi, targeting 18,000 tonnes per year of output in its first phase with commissioning in 2029. The plant will scale up nickel carbonyl refining technology proven at Westwin’s 20 t/y Lawton, Oklahoma demonstration facility, with a completed Bankable Feasibility Study, a long-term site lease, and binding feedstock and offtake agreements already secured. Located adjacent to Natchez’s inland port and regional transport links, the project is expected to create 134 full-time jobs at an average salary of about $84,000.

    Feneck’s ‘rifle approach’ to gold–silver miners: key project filters for teams
    Mining
    about 2 hours ago

    Feneck’s ‘rifle approach’ to gold–silver miners: key project filters for teams

    Investors in gold and silver miners are being urged by Feneck Consulting Group CEO John Feneck to abandon broad ETFs and funds in favour of a “rifle approach”, targeting individual projects with strong management, favourable jurisdictions and proven drill results. Feneck, a 26‑year silver investor who calls it his largest position, says he will only re‑enter aggressively if silver corrects to around $50/oz, stressing strict respect for resistance levels and profit‑taking discipline. He argues current macro conditions for precious metals will only fully play out once US Federal Reserve policy, ongoing wars and US elections stabilise.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Tunnelling

    Specialised solutions for tunnelling projects including grout mix design, hydrogeological analysis, and quality control.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental