Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Contract Award

    Barminco–Regis Duketon extension: cost and ground control notes for engineers

    April 8, 2026|

    Reviewed by Joe Ashwell

    Barminco–Regis Duketon extension: cost and ground control notes for engineers

    First reported on Australian Mining

    30 Second Briefing

    Perenti has secured a further extension to its underground mining services contract with Regis Resources at the Duketon gold operations in Western Australia, reinforcing a long-running contractor–owner relationship on the multi-mine complex. The deal keeps Barminco, Perenti’s underground division, in place for core services such as jumbo development, production drilling, load-and-haul and ground support across Duketon’s underground orebodies. Continuity of a single contractor on a mature site like Duketon typically allows tighter control of unit costs, ground control practices and equipment maintenance strategies.

    Technical Brief

    • Long-term single‑contractor arrangement supports consistent ground support standards and geotechnical data capture across orebodies.

    Our Take

    Duketon sits within Perenti’s core Australian portfolio, and the recent half‑year result showing higher fleet utilisation across Australia suggests this contract extension will help keep Barminco’s underground equipment and crews deployed at relatively high intensity.

    With Perenti having just transitioned to new leadership under Dr Vanessa Torres, a longer‑dated arrangement at Regis Resources’ Duketon operations in Australia provides management with more predictable underground services revenue while other regions and commodities in its book remain more cyclical.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    US DOE $10M critical minerals R&D: process insights for mining engineers
    Mining
    about 15 hours ago

    US DOE $10M critical minerals R&D: process insights for mining engineers

    The US Department of Energy has awarded $10 million via the Critical Materials Innovation Hub to seven early-stage R&D projects targeting more efficient recovery and refining of rare earth elements, gallium, copper and other critical materials. Funded work includes chloride-based molten salt electrolysis for heavy rare earth production at Case Western Reserve, hydro and bio-hydrometallurgical copper extraction at Colorado School of Mines, and nanobubble–surfactant–reactive oxygen leaching of copper sulphides at the University of Arizona. FAST Metals, Indium Corporation, Oak Ridge National Laboratory and the University of Illinois will trial solid-phase extraction, advanced ion-exchange resins and redox-adsorbents to recover gallium and mixed rare earth oxides from bauxite-alumina circuits, zinc refinery residues and industrial byproduct streams.

    Maglut Heavy Industries rare earth strategy: ARC-1 process insights for mine planners
    Mining
    about 15 hours ago

    Maglut Heavy Industries rare earth strategy: ARC-1 process insights for mine planners

    Maglut Heavy Industries is developing a chromatography-based rare earth processing platform at its pilot-scale Long Beach, California facility, reporting 99.9%+ purity for individual rare earth oxides using its ARC-1 water-based separation process. The company designs and manufactures its own resin and ligand systems, aiming for globally competitive costs versus conventional solvent extraction as US defence contractors face January 2027 rules to eliminate Chinese rare earth magnets. A demonstration-scale plant is planned to be fully operational by August 2027, producing commercial rare earth oxides and potentially expanding to other critical minerals.

    Gold price retreats from three‑month high: risk notes for mine planners
    Mining
    about 15 hours ago

    Gold price retreats from three‑month high: risk notes for mine planners

    Gold retreated from a three-month high after July US PCE inflation printed at 3.7% headline and 3.3% core, with Comex December futures down 1% to $4,649.10/oz and spot off 1.4% at $4,592.53 by late morning in New York. The pullback follows a 14% August surge in bullion, driven by US Treasury bond-market intervention and a 28-tonne weekly inflow into gold-backed ETFs, ahead of Kevin Warsh’s first Jackson Hole speech as Fed chair. Gold and silver miners still post outsized August gains, with Eldorado up 55%, Equinox 53% and Newmont 41%.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Tunnelling

    Specialised solutions for tunnelling projects including grout mix design, hydrogeological analysis, and quality control.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental