Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Contract Award

    Barminco–Regis Duketon extension: cost and ground control notes for engineers

    April 8, 2026|

    Reviewed by Joe Ashwell

    Barminco–Regis Duketon extension: cost and ground control notes for engineers

    First reported on Australian Mining

    30 Second Briefing

    Perenti has secured a further extension to its underground mining services contract with Regis Resources at the Duketon gold operations in Western Australia, reinforcing a long-running contractor–owner relationship on the multi-mine complex. The deal keeps Barminco, Perenti’s underground division, in place for core services such as jumbo development, production drilling, load-and-haul and ground support across Duketon’s underground orebodies. Continuity of a single contractor on a mature site like Duketon typically allows tighter control of unit costs, ground control practices and equipment maintenance strategies.

    Technical Brief

    • Long-term single‑contractor arrangement supports consistent ground support standards and geotechnical data capture across orebodies.

    Our Take

    Duketon sits within Perenti’s core Australian portfolio, and the recent half‑year result showing higher fleet utilisation across Australia suggests this contract extension will help keep Barminco’s underground equipment and crews deployed at relatively high intensity.

    With Perenti having just transitioned to new leadership under Dr Vanessa Torres, a longer‑dated arrangement at Regis Resources’ Duketon operations in Australia provides management with more predictable underground services revenue while other regions and commodities in its book remain more cyclical.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Mining
    about 9 hours ago

    Perenti’s Barminco A$180m Duketon extension: planning notes for mine engineers

    Perenti’s underground mining arm Barminco has secured a A$180 million extension to its alliance-style contract with Regis Resources at the Duketon Operations in Western Australia’s Goldfields, building on the three-year agreement first announced on 2 April 2024. The extension keeps Barminco in place for additional years of underground development and production services, locking in fleet, workforce and ground support planning across multiple Duketon orebodies. Contractors and suppliers can expect continued demand for underground drilling, blasting, ventilation, and backfill consumables tied to Regis’ ongoing gold production strategy.

    Mining
    about 10 hours ago

    AngloGold Ashanti’s Normet SmartDrive at Cuiabá: ventilation and shotcrete lessons for engineers

    AngloGold Ashanti has deployed a Normet Utimec LF 600 Transmixer SD battery-electric concrete mixer at its Cuiabá underground gold mine in Brazil, claimed as the first electric concrete mixer operating in the country. The SmartDrive unit will undergo an 18‑month trial, targeting reduced diesel use and lower heat and exhaust loads in confined headings. For geotechnical and shotcrete operations, the trial will test whether battery haul and mixing cycles can maintain required concrete quality and placement rates without compromising ventilation design.

    Mining
    about 10 hours ago

    Cobre Panamá stockpiled ore approval: geotechnical and risk notes for engineers

    First Quantum Minerals has received formal approval from the Government of Panama to remove, process and export stockpiled ore at the 85 Mt/y Cobre Panamá copper complex, limited to material mined before the November 2023 suspension. The campaign will draw down existing ROM and crushed ore stockpiles to reduce geotechnical and environmental risks from long-term surface storage, including potential slope instability and contact water management issues. Processing will use the existing concentrator and tailings facilities under previously permitted operating parameters.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Tunnelling

    Specialised solutions for tunnelling projects including grout mix design, hydrogeological analysis, and quality control.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy