Geomechanics.io

  • Free Tools
Sign UpLog In
Built byBoxcut Studio

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Contract Award

    Barminco A$850m Bellevue gold project award: underground scope and risks for engineers

    May 13, 2026|

    Reviewed by Joe Ashwell

    Barminco A$850m Bellevue gold project award: underground scope and risks for engineers

    First reported on International Mining – News

    30 Second Briefing

    Barminco has secured an underground mining services contract worth about A$850 million over four years, with a one-year extension option, at Bellevue Gold’s high-grade Bellevue gold project in Western Australia. The scope is expected to cover decline and level development, production stoping and associated underground services for the planned underground mine, positioning Barminco as the key contractor through the project’s ramp-up phase. The scale and term of the award signal long-term demand for specialised underground fleet, labour and ground support capacity in the WA gold sector.

    Technical Brief

    • Optional one-year extension would lift total potential term to five years, improving fleet amortisation planning.
    • Scope selection indicates Bellevue is committing to an owner–contractor underground model rather than full owner-mining.
    • Four-year base term aligns with typical initial production ramp-up plus early steady-state phase for WA underground gold.
    • Contract scale will require sustained access to skilled underground labour in Western Australia’s tight mining market.
    • Long-duration services agreement provides Barminco with medium-term visibility for capital allocation to underground fleet.

    Our Take

    Perenti Limited’s recent leadership change, with Dr Vanessa Torres stepping in as managing director and CEO, comes just weeks before this Bellevue Gold award, suggesting the new executive team is doubling down on high‑grade underground work in Western Australia.

    In our database of 1180 Mining stories, relatively few gold pieces involve such large, multi‑year underground services packages in Western Australia, which indicates Bellevue Gold is positioning itself alongside the more capital‑intensive, long‑life underground operations in the state rather than shorter‑cycle open pits.

    Barminco’s renewed work with Regis Resources at the Duketon gold operations, combined with this Bellevue gold project contract, consolidates its role as a preferred underground contractor for multiple gold owners in Western Australia, which can give it leverage on fleet deployment and labour sharing across nearby sites.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Expander pivot pins: reducing long-term maintenance costs for mine fleets
    Mining
    about 6 hours ago

    Expander pivot pins: reducing long-term maintenance costs for mine fleets

    Hidden costs from traditional pivot pin maintenance on haul trucks, forestry harvesters and excavators are driving interest in Expander System’s oversized pivot pins with tapered sleeves, according to Nord-Lock Group head of sales Robin Persson. The retrofit design allows installation in worn pivot eyes without line boring or welding, using conical sleeves to create full-surface contact and reduce clearance growth. For mine maintenance teams, this can cut repeated pin replacement shutdowns and lower life-cycle costs on high-load joints such as dump body hinges, loader booms and articulation points.

    Canadian Chrome Company First Nations committee: M&A risk notes for project teams
    Mining
    about 6 hours ago

    Canadian Chrome Company First Nations committee: M&A risk notes for project teams

    Canadian Chrome Company has formed a three-person First Nations steering committee, including former Attawapiskat Chief Theresa Okimaw-Hall and former Marten Falls Chief Lawrence Baxter, to advise on its Ring of Fire chromite, nickel, copper and platinum assets in Ontario’s James Bay Lowlands. The committee will provide Indigenous perspectives to prospective buyers or partners ahead of any sale or merger involving CCC’s 90% interest in the Koper Lake project and 30% in the Big Daddy project. Both projects remain at pre‑PFS stage, with no new economic analysis disclosed.

    Boron One Serbia PEA update: economics and design notes for mine planners
    Mining
    about 6 hours ago

    Boron One Serbia PEA update: economics and design notes for mine planners

    Boron One’s updated PEA for the Piskanja underground boron project in southern Serbia lifts the after-tax IRR to 89% and NPV (10% discount) to US$558.8 million, with unchanged initial capex of US$79.9 million and a sub‑one‑year payback, but shortens mine life to 13 years and trims average annual EBITDA to US$87.7 million. The plan now targets average yearly output of 157,600 tonnes of colemanite, 83,800 tonnes of ulexite and 25,000 tonnes of boric acid, at all‑in sustaining costs of US$231.44 per tonne. The revised study incorporates new geotechnical testing, a 3D resource model by borate type and a binding offtake for at least 25,000 tonnes of boron products per year, subject to permitting and plant qualification.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Tunnelling

    Specialised solutions for tunnelling projects including grout mix design, hydrogeological analysis, and quality control.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental