Geomechanics.io

  • Free Tools
Sign UpLog In
Built byBoxcut Studio

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects

    B2Gold’s $740m Gramalote permit hearing: project economics and schedule for engineers

    November 5, 2026|

    Reviewed by Joe Ashwell

    B2Gold’s $740m Gramalote permit hearing: project economics and schedule for engineers

    First reported on MINING.com

    30 Second Briefing

    Colombia’s environmental regulator ANLA will hold a 10 November public hearing on B2Gold’s revised permit for the $740 million Gramalote open-pit gold project in Antioquia, a prerequisite for construction ahead of a targeted late-2029 start-up. The scaled-back plan, based on a 2025 feasibility study, envisages 11 years of mining and 13 years of processing, with average output of 227,000 oz/y in the first five years and total initial plus sustaining capital of about $1.18 billion. The decision will test Bogotá’s push to revive mining investment, which has fallen 88% since 2022.

    Technical Brief

    • Revised permit seeks approval to relocate the processing plant and multiple supporting infrastructure elements on site.
    • ANLA has already briefed over 500 residents from San Roque and Yolombó ahead of the 10 November hearing.
    • Original environmental licence dates from 2015 and covered a larger-scale open-pit operation than the current plan.
    • Gramalote’s indicated resource stands at 155.6 Mt @ 0.70 g/t Au (~3.52 Moz contained).
    • Inferred resource adds 120.9 Mt @ 0.52 g/t Au (~2.0 Moz), providing upside for future mine planning.
    • Post-construction capital is estimated at US$444 million, of which US$376 million is sustaining capital.
    • B2Gold assumed full ownership in 2023 by acquiring AngloGold Ashanti’s remaining 50% interest in the project.
    • Colombia’s foreign mining investment fell from US$1.51 billion (2022) to US$178 million (2025), framing Gramalote’s permitting as a sector test case.

    Our Take

    With Gramalote’s low indicated grade of 0.7 g/t gold, B2Gold is effectively balancing a lower-margin Colombian build against higher-grade assets like the Goose mine in Nunavut, which our coverage shows delivering double‑digit gram-per-tonne intercepts; permitting delays here could tilt capital and management attention further toward Canada and Mali.

    The government’s stated need for a 10% expansion in the mining industry to hit a 6% growth target gives B2Gold and other operators in Colombia additional leverage in negotiations around timelines and conditions for projects like Gramalote and Petrobras’ Sirius gas project, even as environmental licensing remains the formal bottleneck.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    Cancel at any time.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Austral–Hammer Metals takeover: copper pit options and risks for mine planners
    Mining
    about 10 hours ago

    Austral–Hammer Metals takeover: copper pit options and risks for mine planners

    Austral Resources has secured Federal Court approval for its scheme of arrangement to acquire Hammer Metals, with the deal becoming legally effective on 16 November and aimed at expanding copper operations in north-west Queensland. The transaction consolidates Austral’s existing Lady Annie–type heap leach and SX–EW copper production footprint with Hammer’s Mount Isa–region exploration ground, including several IOCG and copper–gold targets. For geotechnical and mine planners, the combined tenure increases optionality for open-pit and potential underground copper development in a tightly contested Queensland copper belt.

    Tungsten Mining’s Watershed project: DFS economics and design notes for engineers
    Mining
    about 10 hours ago

    Tungsten Mining’s Watershed project: DFS economics and design notes for engineers

    Tungsten Mining’s definitive feasibility study for the Watershed tungsten project in Far North Queensland reports a pre-tax net present value of $1.57 billion and internal rate of return of 70 per cent, with post-tax figures of $1.11 billion NPV and 57 per cent IRR. The project centres on open-pit extraction of scheelite and wolframite ores, with processing via conventional crush–grind–flotation to produce tungsten concentrate. These economics signal a potentially high-margin Australian tungsten supply source, relevant for long-term offtake and project finance decisions.

    Mount Isa critical minerals hub: feasibility insights for process engineers
    Mining
    about 10 hours ago

    Mount Isa critical minerals hub: feasibility insights for process engineers

    A proposed critical minerals and rare earths research centre in Mount Isa has secured a $965,000 commitment from the Australian and Queensland governments and Mount Isa City Council to fund a feasibility study. The concept focuses on metallurgical testing, piloting and treatment of critical minerals and rare earths, potentially giving North West Queensland miners local access to bench‑scale and pilot‑scale process development instead of sending samples interstate. For geometallurgy and flowsheet design teams, a local hub could shorten testwork lead times and de‑risk new processing routes for complex orebodies.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental