Geomechanics.io

  • Free Tools
Sign UpLog In

    Geomechanics.io

    Geomechanics, Streamlined.

    © 2026 Geomechanics.io. All rights reserved.

    Geomechanics.io

    CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

    Industries

    MiningConstructionTunnelling

    Company

    Terms of UsePrivacy PolicyLinkedIn
    Projects
    Contract Award

    Artemis–Vista $427M deal: Mt Todd project economics and scale for mine planners

    September 22, 2026|

    Reviewed by Joe Ashwell

    Artemis–Vista $427M deal: Mt Todd project economics and scale for mine planners

    First reported on MINING.com

    30 Second Briefing

    Artemis Gold will acquire Vista Gold in a $427 million all-share deal, giving it 100% of the permitted Mt Todd project in Australia’s Northern Territory and a pathway to more than 1 million oz. of annual production alongside its Blackwater mine in British Columbia. Mt Todd is a feasibility-stage asset with a 50,000 t/d processing plant approval, 9.1 million oz. measured and indicated at 0.83 g/t, an after-tax NPV of $1.1 billion and 28% IRR at $2,500/oz gold. The project sits on Jawoyn Association land, has road, rail and gas access, and includes over 1,300 sq. km of contiguous exploration licences with gold, copper, tin and tungsten occurrences.

    Technical Brief

    • Mt Todd has existing approvals for a 50,000 t/d processing plant, reducing permitting lead time.
    • Feasibility work indicates a 2.7-year post-tax payback at $2,500/oz and 5% discount rate.
    • Resource base includes 340.4 Mt measured/indicated at 0.83 g/t plus 57.1 Mt inferred at 0.78 g/t.
    • Site lies ~290 km by road from Darwin and 56 km from Katherine, with road, rail and gas access.
    • Mining ceased in 2001, so redevelopment will involve brownfield rehabilitation alongside new plant construction.
    • Tenure package covers >1,300 km² of contiguous licences over a 25+ km NE mineralised trend.
    • Land access is governed by an agreement with the Jawoyn Association Aboriginal Corporation, constraining development conditions.
    • Transaction closing targeted for January, subject to shareholder, court, foreign investment and Northern Territory approvals.

    Our Take

    Artemis Gold already features in several of our recent items for capital cost creep and execution risk at the Blackwater gold project in central B.C., so adding Mt Todd in Australia’s Northern Territory gives it a second large, capital‑intensive build to manage across two jurisdictions.

    The inclusion of Fortune Minerals’ NICO deposit in the deal context, with its 12% share of global bismuth reserves plus gold credits, underlines that Artemis’ move is occurring against a backdrop where critical‑minerals assets in Canada’s North are increasingly being evaluated for their by‑product gold rather than as pure base‑metal plays.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Sunshine Silver Mining’s 60% Idaho mineral rights boost: exploration lens for engineers
    Mining
    about 2 hours ago

    Sunshine Silver Mining’s 60% Idaho mineral rights boost: exploration lens for engineers

    Sunshine Silver Mining & Refining has expanded its consolidated mineral rights in Idaho’s Silver Valley by about 14,100 acres, a 60% increase to roughly 38,000 acres, making it the largest mineral rights holder in the district. The company is launching a multi-year, 45,000-metre surface drilling campaign starting Q4, initially targeting East Sunshine (along strike from the Sunshine mine), Rock Creek and Pine Creek. Much of the enlarged land package has seen limited modern exploration, signalling significant upside for additional deposits beyond the existing Sunshine mine.

    Fortune Minerals’ NICO mine permits: design, access and closure notes for engineers
    Mining
    about 2 hours ago

    Fortune Minerals’ NICO mine permits: design, access and closure notes for engineers

    Water licence renewal and a land use permit for Fortune Minerals’ NICO cobalt-gold-bismuth-copper project in the Northwest Territories have been approved, setting binding conditions for mine construction, operation, and closure security. The development combines an open pit and underground mine plus concentrator linked by an approved access road to the territorial highway, with concentrates shipped to a dedicated hydrometallurgical plant in Alberta. NICO hosts about 12% of known global bismuth reserves and 1.1 million in-situ ounces of gold, targeting domestic output of cobalt sulphate, bismuth ingots and copper cement.

    Mining
    about 2 hours ago

    Continental’s in-company store at Vale S11D: conveyor uptime lens for engineers

    Continental has opened an In-Company Store inside Vale’s S11D iron ore complex at Canaã dos Carajás, Pará, to supply conveyor belting and related technology directly on site. The facility is intended to shorten response times for high-wear components on S11D’s extensive overland conveyor network, reducing downtime risk on one of the world’s largest truckless mining operations. Embedded support staff will handle belt selection, splicing materials, and condition-based service, tightening integration between Continental’s maintenance expertise and Vale’s production teams.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental