Geomechanics.io

  • Free Tools
Sign UpLog In

    Geomechanics.io

    Geomechanics, Streamlined.

    © 2026 Geomechanics.io. All rights reserved.

    Geomechanics.io

    CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

    Industries

    MiningConstructionTunnelling

    Company

    Terms of UsePrivacy PolicyLinkedIn
    Projects
    Product

    Argentina’s mining ramp‑up: FLS and Sandvik openings – key notes for project engineers

    September 22, 2026|

    Reviewed by Joe Ashwell

    Argentina’s mining ramp‑up: FLS and Sandvik openings – key notes for project engineers

    First reported on International Mining – News

    30 Second Briefing

    Argentina’s rapid mining build-out under President Javier Milei, anchored by major copper and lithium projects such as Taca Taca, Los Azules, El Pachón, Josemaría, Rincon and PPG, is triggering new in-country investments by OEMs FLSmidth (FLS) and Sandvik. Both suppliers are opening additional Argentine locations to support large-scale concentrators and leach operations, positioning for long-life copper porphyry and brine projects that will demand high-throughput crushing, grinding and materials handling systems. For engineers, this signals growing local availability of technical services, spares and process optimisation support.

    Technical Brief

    • Named greenfield copper and lithium projects include Taca Taca, Los Azules, Altar, El Pachón, PPG, Rincon and Josemaría.
    • Project pipeline spans both porphyry copper concentrators and lithium brine operations, implying diverse flowsheet requirements.
    • Concentrator builds at sites like Taca Taca and Josemaría will demand large SAG/ball mills and high-capacity crushers.
    • Lithium brine schemes such as Rincon and PPG point to significant leach, evaporation and impurity-removal plant demand.
    • El Pachón and Altar, as high-altitude Andean porphyries, will require cold-climate materials handling and dewatering solutions.
    • Long-haul logistics from Andean sites to ports will increase reliance on robust conveying, stacking and loading systems.
    • OEM in-country presence reduces lead times for critical wear parts on grinding, crushing and pumping circuits.

    Our Take

    FLS’s new presence in Argentina for copper and lithium projects like Taca Taca and Los Azules aligns with its recent push to anchor regional service hubs, as seen in the US$15 million Karaganda expansion in Kazakhstan, signalling a strategy to lock in aftermarket and lifecycle work close to large greenfield builds.

    Across the 1278 Mining stories in our database, copper and lithium pieces are disproportionately tied to multi-asset project clusters like Josemaria–Altar–El Pachon, which typically drive early moves by OEMs such as FLS and Sandvik to secure long-term equipment and parts corridors.

    Javier Milei’s Argentina focus on mining-friendly policy, combined with OEM localisation, likely shortens response times for high-wear process and drilling components at projects such as Rincon and PPG, which can materially improve uptime in remote Andean operations compared with importing from Brazil or Chile-based hubs.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Sunshine Silver Mining’s 60% Idaho mineral rights boost: exploration lens for engineers
    Mining
    about 2 hours ago

    Sunshine Silver Mining’s 60% Idaho mineral rights boost: exploration lens for engineers

    Sunshine Silver Mining & Refining has expanded its consolidated mineral rights in Idaho’s Silver Valley by about 14,100 acres, a 60% increase to roughly 38,000 acres, making it the largest mineral rights holder in the district. The company is launching a multi-year, 45,000-metre surface drilling campaign starting Q4, initially targeting East Sunshine (along strike from the Sunshine mine), Rock Creek and Pine Creek. Much of the enlarged land package has seen limited modern exploration, signalling significant upside for additional deposits beyond the existing Sunshine mine.

    Fortune Minerals’ NICO mine permits: design, access and closure notes for engineers
    Mining
    about 2 hours ago

    Fortune Minerals’ NICO mine permits: design, access and closure notes for engineers

    Water licence renewal and a land use permit for Fortune Minerals’ NICO cobalt-gold-bismuth-copper project in the Northwest Territories have been approved, setting binding conditions for mine construction, operation, and closure security. The development combines an open pit and underground mine plus concentrator linked by an approved access road to the territorial highway, with concentrates shipped to a dedicated hydrometallurgical plant in Alberta. NICO hosts about 12% of known global bismuth reserves and 1.1 million in-situ ounces of gold, targeting domestic output of cobalt sulphate, bismuth ingots and copper cement.

    Mining
    about 2 hours ago

    Continental’s in-company store at Vale S11D: conveyor uptime lens for engineers

    Continental has opened an In-Company Store inside Vale’s S11D iron ore complex at Canaã dos Carajás, Pará, to supply conveyor belting and related technology directly on site. The facility is intended to shorten response times for high-wear components on S11D’s extensive overland conveyor network, reducing downtime risk on one of the world’s largest truckless mining operations. Embedded support staff will handle belt selection, splicing materials, and condition-based service, tightening integration between Continental’s maintenance expertise and Vale’s production teams.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental