Geomechanics.io

  • Free Tools
Sign UpLog In

    Geomechanics.io

    Geomechanics, Streamlined.

    © 2026 Geomechanics.io. All rights reserved.

    Geomechanics.io

    CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

    Industries

    MiningConstructionTunnelling

    Company

    Terms of UsePrivacy PolicyLinkedIn
    Standard/Guideline
    Sustainability
    Projects

    ACE Group–EIC nature plan: policy takeaways for UK infrastructure engineers

    June 3, 2026|

    Reviewed by Joe Ashwell

    ACE Group–EIC nature plan: policy takeaways for UK infrastructure engineers

    First reported on New Civil Engineer

    30 Second Briefing

    ACE Group’s Environmental Industries Commission has issued a policy roadmap urging UK governments to classify nature-based solutions – such as wetlands, urban forests and green roofs – as core infrastructure on a par with roads, rail and engineered flood defences. The plan seeks multi‑year funding, integration into National Policy Statements and Treasury Green Book appraisal, and explicit performance metrics for biodiversity, flood attenuation and urban cooling. For designers and geotechnical teams, this signals stronger policy backing for hybrid schemes combining hard defences with soil‑ and vegetation‑based systems.

    Technical Brief

    • Policy roadmap is issued by the Environmental Industries Commission, a specialist arm of ACE Group.
    • Nature-based measures are positioned for inclusion in the same decision pathways as major rail and energy schemes.

    Our Take

    The Association for Consultancy and Engineering and ACE Group have featured repeatedly in our recent Policy coverage, signalling that their nature-focused infrastructure guidance is likely to be picked up quickly by UK consultants and client bodies rather than remaining a purely advocacy document.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    UK energy cyber security strategy: design implications for civil engineers
    Policy
    about 23 hours ago

    UK energy cyber security strategy: design implications for civil engineers

    The UK Government has released a four‑year Cyber Security in the Energy Sector strategy to harden electricity, gas and downstream oil networks as they become more digital and decentralised. The plan targets operational technology such as SCADA and substation control systems, sets resilience expectations for network operators and generators, and aligns with Ofgem’s cyber resilience guidelines. For civil and energy engineers, this signals tighter requirements on cyber‑secure design of control rooms, grid‑connected assets and data interfaces on new low‑carbon and smart‑grid projects.

    ICE on UK seventh carbon budget: net zero implications for project engineers
    Policy
    1 day ago

    ICE on UK seventh carbon budget: net zero implications for project engineers

    Publication of the UK’s proposed seventh carbon budget on 2 June has been welcomed by the Institution of Civil Engineers as a sign that government is maintaining focus on the statutory 2050 net zero target. ICE is likely to press for clearer pathways on embodied carbon in concrete and steel, whole-life assessments for major schemes, and integration with the National Infrastructure Commission’s recommendations. Civil and geotechnical engineers should expect tighter carbon reporting requirements on large projects and stronger scrutiny of design choices affecting operational emissions.

    FBI raid uncovers $40M gold stash: custody and traceability lessons for projects
    Policy
    6 days ago

    FBI raid uncovers $40M gold stash: custody and traceability lessons for projects

    FBI agents have arrested former senior CIA official David Rush after a raid on his Virginia home uncovered 303 gold bars worth about $40 million at current prices, plus $2 million in cash and nearly three dozen luxury watches, many reportedly Rolexes. Court filings allege Rush obtained the bullion by submitting multiple requests for “work-related expenses” between November 2025 and March 2026 and also falsified academic and Navy Reserve credentials to claim tens of thousands of dollars in military leave pay. The case raises fresh scrutiny over traceability and custody controls for government-held precious metals.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental