Geomechanics.io

  • Free Tools
Sign UpLog In
Built byBoxcut Studio

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects

    Abenójar Tungsten London IPO: project economics and schedule for mine planners

    October 31, 2026|

    Reviewed by Tom Sullivan

    Abenójar Tungsten London IPO: project economics and schedule for mine planners

    First reported on MINING.com

    30 Second Briefing

    Abenójar Tungsten raised €170 million in London’s largest mining IPO since 2018, listing at 110 pence per share for a £522 million market capitalisation, with early trading around 105 pence. Funds will advance construction of the El Moto project in central Spain, billed as one of the world’s largest high‑grade undeveloped tungsten deposits, with EU “strategic project” status for both the mine and its processing plant. First commercial production of tungsten concentrate is targeted for Q1 2029, positioning El Moto as a key non‑Chinese supply source for defence, aerospace and tooling.

    Technical Brief

    • Construction at El Moto is already underway, moving the tungsten deposit beyond pure exploration status.
    • Abenójar Tungsten has spent 14 years advancing El Moto from prospect to mine under construction.
    • Early-stage development of an on-site processing plant aims to refine mine concentrate within Spain.
    • Meeting the Q1 2029 production target hinges on delivering mine build and processing infrastructure over the next two years.
    • London listing on the Main Market was chosen to access specialist mining investors for long-term capex.

    Our Take

    Within our 74 keyword-matched pieces on tungsten and uranium, most capital-markets activity has centred on ASX and TSX listings, so Abenójar Tungsten’s move onto the London Stock Exchange signals that European tungsten projects are starting to access deeper, more traditional institutional pools again.

    With Europe explicitly flagged in the article facts and tungsten on the EU’s critical raw materials radar, a Spain-based El Moto project could be well positioned for future EU-level funding tools or offtake support mechanisms that have been discussed in other critical-minerals policy coverage in our database.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Uranium shares slide: supply, cost and project risks unpacked for mine planners
    Mining
    about 3 hours ago

    Uranium shares slide: supply, cost and project risks unpacked for mine planners

    Uranium mining equities fell sharply in September, with the VettaFi Global Uranium Mining Index down 16% and the Nasdaq Sprott Junior Uranium Miners Index off 22%, even as TradeTech’s long-term price indicator held near an 18‑year high at US$97/lb and BMI forecasts an average US$95/lb spot price in 2027. Supply risks centre on Kazakhstan’s in‑situ leach operations, where Kazatomprom’s sulphuric acid plant commissioning has slipped to 3Q 2027–1Q 2028, and on Western project execution, including NexGen’s Rook I (first ore targeted 3Q 2030) and Anfield’s Shootaring Canyon mill restart (mid‑2028). Cameco’s 3Q EBITDA of C$267 million came in 44% below BMO’s forecast, with attributable production 19% under expectations and cost-of-sales guidance raised to C$67–70/lb, reinforcing investor focus on cost inflation and operational reliability.

    Lynas price floors and Caldeira deal: margin and supply notes for mine planners
    Mining
    about 3 hours ago

    Lynas price floors and Caldeira deal: margin and supply notes for mine planners

    Lynas Rare Earths has secured minimum-price contracts covering over half its output, pushing average realised prices up 88% to a record A$102.1/kg and quarterly revenue up 55% to A$310.1 million, despite an 18% drop in sales volumes to 3,039 tonnes of rare earth oxides. Production reached 4,254 tonnes, including a record 2,082 tonnes of neodymium-praseodymium oxide, with planned shutdowns at the Malaysian separation plant (about one month) and Kalgoorlie (about two weeks) expected to be covered by inventories. The A$12.2 billion company is also advancing a A$968 million all-share acquisition of Meteoric Resources’ Caldeira project in Brazil to supply mixed rare earth carbonate into its Malaysia-based separation circuit.

    Gold and silver price slump: key risk signals for mine planners and engineers
    Mining
    about 3 hours ago

    Gold and silver price slump: key risk signals for mine planners and engineers

    Gold slumped 3.2% intraday to $3,891.67/oz, its lowest in a year and about 28% below January’s $5,419.83 record close, while silver dropped 5.8% to $49.34/oz, erasing gains from its run above $120 and pushing the gold-silver ratio to its highest since December. Heavy Comex volumes saw futures covering 18 million oz of gold and 236 million oz of silver trade by midday as higher oil, renewed Fed hike bets and tech-led equity losses forced liquidation. Equity damage is severe: Newmont, Agnico, Barrick, Wheaton and Franco-Nevada have collectively shed nearly $140 billion from 52-week highs, with Kinross and major silver names such as Hecla and Coeur now more than 50% off their peaks.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental