Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects

    Wrights’ first Fassi unit: load-handling configuration and duty profile for engineers

    April 9, 2026|

    Reviewed by Joe Ashwell

    Wrights’ first Fassi unit: load-handling configuration and duty profile for engineers

    First reported on The Construction Index

    30 Second Briefing

    Wrights of Twycross has added its first Fassi unit, a Scania P500 Highline 8x2 32-tonne rigid from Mac’s Truck Sales fitted with a F545RA.2.25 loader crane rated to lift 3,080kg at 14.2m and a heavy-duty Mac’s Spec cheesewedge body providing a 10-tonne payload. The truck, turned around in four weeks from a stock build, also carries a VBG drawbar coupling for additional trailer capacity roughly twice a week. It will operate five to six days weekly on containers, pipework, holding tanks, trackway matting and heavy plant, supporting Wrights’ one-driver, one-truck policy.

    Technical Brief

    • Cheesewedge body configuration improves drive-on/drive-off angles for tracked plant versus straight beavertail layouts.
    • VBG drawbar coupling allows modular capacity increases without committing to a permanent articulated combination.
    • Four-week delivery was achieved by adapting a pre-built stock chassis rather than commissioning a new build.
    • Wrights’ fleet being 75% Scania simplifies parts stocking, diagnostics and driver familiarisation across operations.
    • Highline sleeper cab with fridge and microwave supports eight–ten hour daily shifts without external welfare units.
    • One-driver, one-truck allocation reduces variability in loading practice and in-cab equipment wear patterns.

    Our Take

    Scania appears repeatedly across our infrastructure coverage, from this 32‑tonne P‑series rigid for Wrights of Twycross to heavy tippers at LKAB’s Malmberget iron ore mine, signalling that operators are standardising on the brand for both on‑highway and demanding off‑highway roles in Europe.

    With 75% of Wrights of Twycross’s fleet already Scania and drivers spending 8–10 hours per day in the cab, the quick four‑week delivery and familiar chassis specification are likely aimed at minimising training and integration time compared with introducing a different OEM into the fleet.

    The 10‑tonne payload on a 32‑tonne 8×2 chassis suggests Wrights is prioritising crane capability and stability over maximum payload, a pattern also seen in other UK crane and plant fleets in our database where urban or precision lifting is more critical than bulk haulage efficiency.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Strabag’s Pfaffensteig Tunnel contract: design and delivery notes for rail engineers
    Infrastructure
    about 1 month ago

    Strabag’s Pfaffensteig Tunnel contract: design and delivery notes for rail engineers

    Strabag and Group company Züblin have secured the design-and-build structural works for the ABS Gäubahn Nord/Pfaffensteig Tunnel in south-west Germany, centred on an 11km twin-bore rail tunnel linking Stuttgart Airport station directly to the Gäubahn line towards Switzerland. About 9.8km will be driven by two TBMs, with conventional tunnelling for the A8 motorway undercrossing and airport connection, plus a 240m cut-and-cover section, retaining structures, railway underpasses and a grade-separated crossing. A 3km surface section will be upgraded and partially realigned for 200km/h operation, delivered under an integrated project delivery model with Ed. Züblin, Wayss & Freytag and Strabag AG sharing tunnelling, structural and earthworks packages.

    National Grid TBM under the Thames: tunnelling design and risk notes for engineers
    Infrastructure
    4 months ago

    National Grid TBM under the Thames: tunnelling design and risk notes for engineers

    A 271.5‑tonne Herrenknecht Mixshield TBM, Caroline, has started driving a 2.2km electricity cable tunnel with a 4m internal diameter beneath the River Thames in Essex for National Grid’s Grain to Tilbury project, delivered by the Ferrovial BEMO joint venture. The drive will pass through variable Thames estuary ground conditions between 35m‑deep launch and reception shafts of 15m and 12m diameter, with tunnelling continuing into 2026 and overall scheme completion targeted for 2029. The new tunnel will replace the 1969 Thames Cable Tunnel and carry new high‑voltage circuits between Grain and Tilbury substations.

    Panama Canal Mixshield undercrossing: design and tunnelling lessons for engineers
    Infrastructure
    4 months ago

    Panama Canal Mixshield undercrossing: design and tunnelling lessons for engineers

    A 13.46m diameter Herrenknecht Mixshield TBM has broken through into the future Balboa station on Panama Metro Line 3 after completing the first-ever TBM undercrossing of the Panama Canal at depths exceeding 60m below sea level. The 5,600kW, 26,616kNm machine, fitted with an accessible cutterhead and more than 4,500 sensors linked via the Herrenknecht.Connected platform, has achieved peak advance of 150 segment rings (about 300m) per month through mixed sandstone, tuff, breccias and basalt. Around 1.5km of the 4.5km twin-track tunnel remains to final breakthrough.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy