Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects

    Wates picks Grace for London role: commercial strategy notes for project teams

    July 25, 2026|

    Reviewed by Tom Sullivan

    Wates picks Grace for London role: commercial strategy notes for project teams

    First reported on The Construction Index

    30 Second Briefing

    Wates Group has appointed Kevin Grace as commercial director for Wates Construction London, following April’s confirmation of George Mosey as managing director, as part of a reset of its London construction business. Grace joins from Mace Construct, where he was commercial lead on the £1.1bn British Library extension, bringing UK and Australian major-projects experience in commercial management. He will take up the role in October, leading commercial strategy on large-scale, high-value public and private sector schemes across the capital.

    Technical Brief

    • Background across UK and Australian major projects suggests exposure to differing risk allocation and procurement models.
    • Reset of Wates Construction London indicates likely re‑baselining of margins, risk allowances and bid selectivity.
    • Strengthened commercial function will influence pricing of high‑value London schemes with constrained urban sites.
    • Public‑sector workload such as cultural and knowledge infrastructure points to long programme, multi‑phase contracts.
    • Private‑sector focus in central London implies intensive interface with developers’ funders and pre‑let covenant requirements.

    Our Take

    Recent coverage of Wates Group in the UK, including its Isle of Wight College project under the Department for Education’s schools framework and the purchase of its Leatherhead HQ, suggests the business is balancing major London cultural schemes with education and corporate estate work, which can help smooth workload and cashflow across cycles.

    Mace Construct’s role on the 1 Victoria Street redevelopment in Westminster, noted in our database, underlines that Wates Construction London will be competing for central government and cultural projects against a peer group already embedded on high-profile Westminster and Whitehall sites.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Strabag’s Pfaffensteig Tunnel contract: design and delivery notes for rail engineers
    Infrastructure
    2 months ago

    Strabag’s Pfaffensteig Tunnel contract: design and delivery notes for rail engineers

    Strabag and Group company Züblin have secured the design-and-build structural works for the ABS Gäubahn Nord/Pfaffensteig Tunnel in south-west Germany, centred on an 11km twin-bore rail tunnel linking Stuttgart Airport station directly to the Gäubahn line towards Switzerland. About 9.8km will be driven by two TBMs, with conventional tunnelling for the A8 motorway undercrossing and airport connection, plus a 240m cut-and-cover section, retaining structures, railway underpasses and a grade-separated crossing. A 3km surface section will be upgraded and partially realigned for 200km/h operation, delivered under an integrated project delivery model with Ed. Züblin, Wayss & Freytag and Strabag AG sharing tunnelling, structural and earthworks packages.

    National Grid TBM under the Thames: tunnelling design and risk notes for engineers
    Infrastructure
    4 months ago

    National Grid TBM under the Thames: tunnelling design and risk notes for engineers

    A 271.5‑tonne Herrenknecht Mixshield TBM, Caroline, has started driving a 2.2km electricity cable tunnel with a 4m internal diameter beneath the River Thames in Essex for National Grid’s Grain to Tilbury project, delivered by the Ferrovial BEMO joint venture. The drive will pass through variable Thames estuary ground conditions between 35m‑deep launch and reception shafts of 15m and 12m diameter, with tunnelling continuing into 2026 and overall scheme completion targeted for 2029. The new tunnel will replace the 1969 Thames Cable Tunnel and carry new high‑voltage circuits between Grain and Tilbury substations.

    Panama Canal Mixshield undercrossing: design and tunnelling lessons for engineers
    Infrastructure
    5 months ago

    Panama Canal Mixshield undercrossing: design and tunnelling lessons for engineers

    A 13.46m diameter Herrenknecht Mixshield TBM has broken through into the future Balboa station on Panama Metro Line 3 after completing the first-ever TBM undercrossing of the Panama Canal at depths exceeding 60m below sea level. The 5,600kW, 26,616kNm machine, fitted with an accessible cutterhead and more than 4,500 sensors linked via the Herrenknecht.Connected platform, has achieved peak advance of 150 segment rings (about 300m) per month through mixed sandstone, tuff, breccias and basalt. Around 1.5km of the 4.5km twin-track tunnel remains to final breakthrough.

    Related Industries & Products

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    QCDB-io

    Comprehensive quality control database for manufacturing, tunnelling, and civil construction with UCS testing, PSD analysis, and grout mix design management.

    AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy