Geomechanics.io

  • Free Tools
Sign UpLog In
Built byBoxcut Studio

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects

    Waratah’s Goldenclad hit at Spur: open-pit potential and drill priorities for planners

    October 23, 2026|

    Reviewed by Tom Sullivan

    Waratah’s Goldenclad hit at Spur: open-pit potential and drill priorities for planners

    First reported on Australian Mining

    30 Second Briefing

    Waratah Minerals has reported a first Goldenclad drill hole (GCD001) intercept of 83m at 1.27g/t gold from just 6m below surface at its Spur project in New South Wales, extending the mineralised corridor 1km along strike from the Consols zone. The shallow, continuous mineralisation suggests potential for open-pit geometries and low strip ratios if continuity is confirmed by follow-up holes. For geologists and mine planners, the result materially enlarges the near-surface target envelope and justifies tighter step-out drilling along the extended corridor.

    Technical Brief

    • GCD001 is the first drill hole completed by Waratah Minerals at the Goldenclad prospect.
    • Mineralisation commences at 6m downhole, indicating minimal pre-strip for any future open-pit scenario.
    • Goldenclad forms part of Waratah’s Spur project in New South Wales, within an established gold district.

    Our Take

    Gold is one of the more densely covered commodities in our Mining category and keyword set, and within that, New South Wales projects like Spur stand out in our database for repeated step-out success rather than M&A-driven growth, signalling that Waratah’s value case is currently exploration-led rather than transaction-led.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Mining
    about 2 hours ago

    Hitachi EX5500-6 hits 100,000 hours at Moatize: life-cycle lessons for mine planners

    Hitachi’s EX5500-6 ultra-large hydraulic excavator at the Moatize coal mine in Tete Province, Mozambique, has surpassed 100,000 operating hours under Vulcan Mozambique SA’s ownership. The EX5500-6, typically a 533–552 t class machine with a 29–34 m³ bucket, has reached this milestone in continuous overburden and coal loading duty in a high-production open-pit environment. The achievement signals long-term structural and hydraulic durability, with implications for life-cycle costing, rebuild strategies, and fleet availability planning on similar ultra-class excavators.

    Mining
    about 2 hours ago

    Epiroc’s unified AirDrill RC portfolio: selection and fleet benefits for engineers

    Epiroc is consolidating its reverse circulation drilling range by unifying its existing RC tools with the AirDrill hammer and bit line into a single AirDrill-branded portfolio. The move standardises product naming and specifications across markets, making it easier for mine and exploration teams to select compatible RC hammers and bits for specific hole diameters and ground conditions. For contractors operating mixed fleets, a single global portfolio should simplify procurement, inventory management and technical support for RC drilling consumables.

    Mining
    about 2 hours ago

    Palabora Mining Company–ABB MV upgrade: reliability and safety notes for engineers

    Palabora Mining Company has upgraded its medium-voltage network with ABB equipment and long-term service support to stabilise power supply at its copper mining and smelting complex in Limpopo, one of South Africa’s highest-demand electrical mining environments. The project focuses on modern protection, control and switching on the MV network, improving fault detection and isolation compared with legacy gear. Higher network reliability directly supports hoisting, crushing and smelting uptime, while reduced manual switching and better arc-flash protection improve electrical safety for maintenance crews.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental