Geomechanics.io

  • Free Tools
Sign UpLog In
Built byBoxcut Studio

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects

    Waratah’s bigger gold resource case: design and resource notes for mine planners

    November 9, 2026|

    Reviewed by Tom Sullivan

    Waratah’s bigger gold resource case: design and resource notes for mine planners

    First reported on Australian Mining

    30 Second Briefing

    Waratah Minerals has intersected new broad zones of gold mineralisation between its Spur deposit and the historic Essex Mine in New South Wales, outside the current Spur resource footprint. The drilling supports Waratah’s geological model that Spur and Essex form a single, larger mineralised system rather than isolated deposits. For mine planners and resource geologists, the linkage could justify step-out drilling, revised pit or underground designs, and an updated resource estimate with a potentially larger strike length and tonnage base.

    Technical Brief

    • New mineralisation sits between the defined Spur resource envelope and the historically mined Essex workings.
    • Intersections occur in previously untested ground, implying a gap area that was not drill constrained.
    • Geometry of the new zones will control whether future designs favour a single large pit or satellite pits.
    • Continuity between Spur and Essex, if confirmed, would simplify haulage, infrastructure placement and dewatering strategies.
    • Historic Essex Mine data (old underground development, sampling, void mapping) becomes critical for 3D geological and geotechnical modelling.
    • Any resource extension along strike will likely require updated geotechnical domains and slope design parameters for open pit options.
    • Underground scenarios would need reassessment of crown pillar thickness and interaction with old Essex stopes.
    • For similar brownfields gold camps, such “linking” drill campaigns can materially change economic cut-off and scheduling assumptions.

    Our Take

    The recent maiden 3.1Moz JORC resource at Spur in New South Wales, noted in our 5 November coverage, puts Waratah Minerals into the upper tier of gold explorers in our database for that state, which can materially improve access to development capital if further growth is demonstrated around the Essex Mine trend.

    Successive drill results along the 6km Spur corridor and around the Consols and Goldenclad zones suggest Waratah is now effectively working a district-scale gold system in New South Wales, which typically favours centralised processing concepts and staged mine development rather than a single-pit approach.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Mining
    about 3 hours ago

    Vivox AI–beSirius supplier reviews: compliance and ESG lens for mine teams

    Vivox AI, known for explainable AI agents in financial crime compliance, has partnered with beSirius, which builds AI tools for assurance and certification readiness in metals and minerals, to automate supplier and counterparty reviews for mining companies, traders and manufacturers. The combined system is aimed at checking evidence for ESG, sanctions, KYC/AML and certification requirements that are currently verified manually via questionnaires and document exchanges. For mine operators, this could materially shorten vendor onboarding cycles and reduce compliance overheads in complex multi-tier supply chains.

    Mining
    about 3 hours ago

    Metso Loesche VRM at Jerritt Canyon: dry grinding design notes for plant engineers

    Metso has secured an order to supply its Metso Loesche VRM dry grinding technology and auxiliary equipment to First Majestic Silver’s Jerritt Canyon Gold Mine restart project in Nevada, marking one of the first mining applications of this vertical roller mill system. The dry VRM setup is expected to replace or reduce conventional wet ball milling and associated dewatering, cutting water use and potentially lowering energy consumption per tonne. Process engineers and plant designers will be watching performance data closely as Jerritt Canyon ramps up under the new flowsheet.

    Mining
    about 3 hours ago

    IGO’s Nova Nickel Operation closure: production outturn and closure lessons for engineers

    IGO Limited has ceased mining and processing at the Nova Nickel Operation in Western Australia, nearly 10 years after first ore, with final reconciliation showing nickel output of 21,340 t, 7% above the top end of life-of-mine guidance. Copper and cobalt production also exceeded guidance, confirming stronger-than-planned metal recovery and orebody performance over the mine’s life. Closure planning, residual processing of stockpiles and potential underground infrastructure reuse will now be key technical considerations for operators and nearby explorers in the Fraser Range.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental