Two Mile Hill at Brightstar: 305m hit and bulk-mining upside for engineers
Reviewed by Joe Ashwell

First reported on Australian Mining
30 Second Briefing
Brightstar Resources’ Two Mile Hill deposit in Western Australia has delivered its largest gold intersection to date, with 305m at 2.66g/t from diamond drilling reported on 12 November, which managing director Alex Rovira says has “fundamentally changed” the geological interpretation. The continuous, moderate-grade intercept over more than 300m suggests a larger, more coherent intrusive-hosted system than previously modelled, with implications for bulk underground mining scenarios rather than narrow-vein targeting. Rovira is now steering updated resource modelling and mine planning studies to test larger-scale development options for the project.
Technical Brief
- For comparable intrusive-hosted gold systems in WA, such reinterpretations have often driven revised pit‑to‑underground transition depths.
Our Take
The 305m at 2.66g/t gold intersection at Two Mile Hill sits alongside Brightstar Resources’ recent definition of 11 priority targets along the Two Mile Hill–Bull Oak corridor, signalling that the Sandstone camp is being scoped more as a district-scale system than a single-deposit play.
With Brightstar’s Laverton processing plant reported as 50 per cent EPC earned value and targeting first gold in June 2027, any scale-up at the Two Mile Hill deposit in Western Australia will likely feed into a broader regional processing strategy rather than require standalone plant capital.
Within our 1279 Mining stories, gold items tied to Western Australia like Brightstar Resources tend to progress quickly from deep-drilling success to corridor-wide target generation, suggesting that permitting and infrastructure in this region support relatively rapid conversion of discoveries into development options.
Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.
Related Articles
Related Industries & Products
Mining
Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.
Construction
Quality control software for construction companies with material testing, batch tracking, and compliance management.
CMRR-io
Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.
HYDROGEO-io
Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.
GEODB-io
Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.
