Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects
    Standard/Guideline

    SILVER Act and US vault expansion: systemic risk and logistics lens for miners

    May 22, 2026|

    Reviewed by Joe Ashwell

    SILVER Act and US vault expansion: systemic risk and logistics lens for miners

    First reported on MINING.com

    30 Second Briefing

    US Senators Catherine Cortez Masto and Jim Risch have introduced the bipartisan System Integrity through Licensed Vault Expansion and Resilience (SILVER) Act to amend the Commodity Exchange Act and mandate at least two licensed precious metal depositories in each US time zone, breaking the current concentration around New York City. The bill aims to cut systemic and national security risk, improve market liquidity and reduce storage and transport costs for miners and traders in Western states such as Nevada. Backers include Money Metals Depository, The Silver Institute, A‑Mark Precious Metals/Gold.com and Texas Precious Metals Depository, with a companion bill already filed in the House.

    Technical Brief

    • Geographic diversification explicitly targets current clustering of exchange‑linked vaults in the New York City region.
    • Western mining hubs such as Nevada gain potential for in‑state or regional exchange‑eligible storage.
    • Reduced haul distances to compliant vaults could materially cut insurance, security and armoured transport costs.
    • For mine developers, proximity of licensed depositories may influence project logistics, off‑take structuring and working‑capital cycles.

    Our Take

    The Silver Institute’s projection of a sixth consecutive annual silver market deficit in 2026, noted in our related coverage, means expanded US storage under the SILVER Act would be coming into a structurally tight market where inventory location and accessibility matter more for both investors and industrial users.

    With ReElement Technologies flagged for an $80 million conditional loan and involved in rare earths and copper refining, the same policy environment that is encouraging more licensed vault capacity for gold and silver is also implicitly reinforcing onshore critical-mineral processing and custody within the USA.

    Our Policy category already includes many items on strategic stockpiles, but this is one of the few where storage standards for precious metals intersect directly with defence-linked actors like the Pentagon, signalling that vault siting and licensing could increasingly be treated as national-security infrastructure rather than just financial plumbing.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    ATSB welcomes new commissioner: safety investigation focus for engineers
    Policy
    about 14 hours ago

    ATSB welcomes new commissioner: safety investigation focus for engineers

    James Miller has been appointed Commissioner of the Australian Transport Safety Bureau (ATSB) for a three‑year term, taking responsibility for national rail, marine and aviation safety investigations. Miller brings more than 50 years’ aviation experience, including as Qantas Fleet Captain, into a role that shapes standards and incident analysis across complex, multi‑modal transport networks. For civil and transport engineers, his background suggests continued emphasis on data‑driven accident investigation, operational risk management and interface safety at rail and port infrastructure.

    Ontario threat to cut US electricity, critical minerals: risks for project teams
    Policy
    1 day ago

    Ontario threat to cut US electricity, critical minerals: risks for project teams

    Ontario Premier Doug Ford has warned he is prepared to cut off both electricity exports and critical minerals to the United States after Trump imposed 50% tariffs on about US$20 billion of Canadian goods, including autos, auto parts and steel. Michigan currently receives about 6% of its power from Ontario via four cross-border transmission lines with 2,000 MW transfer capacity, and Ford has already imposed a 25% surcharge on electricity exports to Michigan, Minnesota and New York in 2025. Any suspension of Ontario shipments would hit US supply of high‑grade nickel from the Sudbury Basin (Vale, Glencore) and uranium refined at Cameco’s Blind River facility, the world’s largest commercial uranium refinery.

    US scrap rules: processing bottlenecks and security ratio for engineers
    Policy
    2 days ago

    US scrap rules: processing bottlenecks and security ratio for engineers

    US export restrictions taking effect later in August will force some lithium-ion battery scrap, including black mass, and tungsten scrap to be sold to US buyers, but GEM Mining Consulting’s Alina Karpunina argues supply security hinges on how much of this material is actually converted into qualified secondary minerals. DOE data show a 2023 US mismatch, with intermediate facilities able to process nearly 175,000 tons of batteries and scrap, but only about 35,500 tons of battery-material recovery capacity and 76,000 tons more merely planned. Karpunina proposes a “scrap-to-security conversion ratio” based on contained critical-mineral units recovered to customer specification, warning that export controls without robust domestic processing risk idle feedstock and continued reliance on primary mining.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental