Geomechanics.io

  • Free Tools
Sign UpLog In

    Geomechanics.io

    Geomechanics, Streamlined.

    © 2026 Geomechanics.io. All rights reserved.

    Geomechanics.io

    CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

    Industries

    MiningConstructionTunnelling

    Company

    Terms of UsePrivacy PolicyLinkedIn
    Projects

    Saudi Arabia’s 110 Mt uranium ore find: resource and project lens for engineers

    September 15, 2026|

    Reviewed by Tom Sullivan

    Saudi Arabia’s 110 Mt uranium ore find: resource and project lens for engineers

    First reported on MINING.com

    30 Second Briefing

    Saudi Arabia has reported identifying about 110 million tonnes of uranium-bearing ore in the Medina region, with Energy Minister Prince Abdulaziz bin Salman saying exploration shows “high concentrations” of heavy rare earth elements alongside “promising” uranium grades. No uranium grade, contained metal estimate, mineralogy or recovery factors were disclosed, leaving the economic viability and potential production scale uncertain for now. The find coincides with a 30‑year US–Saudi civilian nuclear co‑operation deal that could permit domestic enrichment and follows C$710 million of Canada–Saudi commercial agreements.

    Technical Brief

    • Recovery is being evaluated as a byproduct of fertiliser production, implying phosphorite or phosphate-processing linkages.
    • Ore is located in the Medina region, adding a new mineral province beyond existing Arabian Shield assets.
    • “High concentrations” of heavy rare earth elements suggest potential dual uranium–REE flowsheet and tailings management complexity.
    • Announcement was made at the IAEA 70th General Conference in Vienna, signalling alignment with international nuclear oversight.
    • Agreement framework potentially permits uranium enrichment on Saudi territory, affecting future in‑country fuel-cycle integration.
    • For mine planners, co‑product uranium–REE–fertiliser schemes will require integrated geometallurgy, residue characterisation and radiological controls from scoping.

    Our Take

    Uranium and rare earth minerals feature in only 41 keyword-matched pieces across our mining coverage, so Saudi Arabia’s Medina-region find places the kingdom alongside a relatively small group of jurisdictions being tracked for both nuclear fuel and critical magnet materials potential.

    The presence of the IAEA in both this Saudi narrative and the DRC-focused related article from 2026-08-07 underscores how nuclear-governance bodies are increasingly intersecting with broader critical minerals supply chains, not just traditional uranium oversight.

    With Saudi Arabia already a major oil and natural gas producer, the identification of uranium- and rare-earth-bearing ore suggests a strategic move to hedge long-term energy revenues by adding nuclear and critical minerals to its resource portfolio, which could alter regional bargaining power in Middle Eastern energy diplomacy.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Milford Mining $25M Utah expansion: throughput and plant upgrade notes for engineers
    Mining
    about 3 hours ago

    Milford Mining $25M Utah expansion: throughput and plant upgrade notes for engineers

    Milford Mining Company Utah has secured a conditional US$25 million, 16.5‑year USDA Rural Development loan guarantee, privately financed via Magnolia Bank, to expand its fully permitted copper mining and processing complex in Beaver County. The investment targets modernisation of processing equipment, removal of bottlenecks and capacity upgrades to double copper cathode and concentrate throughput by end‑2027 across the 62,000‑acre property, which also hosts tungsten, antimony and rare earth elements. MMCU expects to add about 100 jobs to its current 180‑strong workforce in rural Utah.

    Nifty leaching returns after 17 years: heap rehab and SX–EW notes for engineers
    Mining
    about 3 hours ago

    Nifty leaching returns after 17 years: heap rehab and SX–EW notes for engineers

    Cyprium Metals has restarted acid leaching at the Nifty copper complex in Western Australia for the first time since 2009, commissioning existing heaps with acid solution and targeting first copper cathode in the December 2026 quarter. Refurbishment of the site’s solvent extraction and electrowinning (SX–EW) plant is progressing in parallel, enabling a return to on-site cathode production rather than concentrate export. For engineers, the restart centres on rehabilitating legacy heap leach infrastructure and integrating it with an upgraded SX–EW circuit after a 17‑year leach hiatus.

    Ramelius–Primero Mt Magnet expansion: throughput and scheduling notes for mine planners
    Mining
    about 3 hours ago

    Ramelius–Primero Mt Magnet expansion: throughput and scheduling notes for mine planners

    Ramelius Resources has awarded Primero Group the Mt Magnet expansion project in Western Australia, adding 3Mtpa of processing capacity to support its target of 500,000oz of gold production per year by FY30. The EPC-style contract, announced by parent company NRW Holdings, centres on upgrading the existing Mt Magnet plant rather than building a greenfield facility, leveraging current infrastructure and power. For mine planners and process engineers, the uplift in nameplate throughput will drive revised pit schedules, ore blending strategies and potential debottlenecking of crushing and grinding circuits.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental