Geomechanics.io

  • Free Tools
Sign UpLog In
Built byBoxcut Studio

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects

    Rare Earths Norway’s enlarged Fen resource: project and permitting lens for engineers

    March 4, 2026|

    Reviewed by Tom Sullivan

    Rare Earths Norway’s enlarged Fen resource: project and permitting lens for engineers

    First reported on MINING.com

    30 Second Briefing

    Rare Earths Norway has increased the Fen carbonatite complex resource by 81% to 15.9 million tonnes of indicated and inferred rare earth oxides, with 19% NdPr content, overtaking Sweden’s Per Geijer deposit (2.2 million tonnes REO) as Europe’s largest. The company targets late‑2031 start-up and 800 tonnes/year NdPr by 2032, equivalent to about 5% of EU demand, and already holds an extraction permit but still needs an operating permit. Fen also hosts niobium and thorium, positioning it for a potential “mine‑to‑magnet” value chain under the EU’s ResourceEU critical minerals plan.

    Technical Brief

    • WSP’s updated estimate lifts Fen’s indicated and inferred rare earth resources from 8.8 Mt (2024) to 15.9 Mt.
    • Eurostat data show 95% of EU rare earth imports in 2024 came from China, Malaysia and Russia.
    • Rare earths from Fen are targeted for high-performance permanent magnets in EVs, wind turbines and electronics.
    • Defence applications cited include advanced sensors and precision motors in frigates, fighter jets and military drones.
    • Significant niobium and thorium at Fen introduce additional metallurgical, radiation management and permitting considerations.
    • Under the EU’s ResourceEU action plan, Fen could feed regional refining and magnet manufacturing without export destination restrictions.

    Our Take

    With Fen targeting NdPr output in Norway and LKAB’s Per Geijer deposit in Sweden already flagged as a major European rare earths resource, the Nordics are emerging in our coverage as the only European cluster with multiple large-scale rare earth projects that could structurally chip away at the EU’s 95% import dependence on China, Malaysia and Russia.

    The 19% NdPr share in Fen’s oxides, combined with a 2031–2032 production horizon, suggests OEMs in the European electric motor and wind sectors will need interim offtake strategies, as this timeline still leaves a medium‑term gap before meaningful local magnet feedstock is available.

    WSP’s role alongside USA Rare Earth at the Round Top project in Texas, noted in our 2026-01-23 item, indicates that the consultancy is building a rare earths project portfolio across both North America and Europe, which could give Rare Earths Norway access to design and permitting experience from other complex REE flowsheet and permitting environments.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    McEwen’s $55M Ontario asset sale: production growth lens for mine planners
    Mining
    about 2 hours ago

    McEwen’s $55M Ontario asset sale: production growth lens for mine planners

    McEwen has agreed to sell its Fuller and Paymaster gold properties in Ontario’s Timmins district to Discovery Mining for $55 million in cash and stock, freeing capital to push a production target of 250,000–300,000 gold-equivalent ounces per year by 2030. The deal covers 210 hectares at Fuller, a 60% stake in the 179-hectare Paymaster property, and associated surface rights, consolidating Paymaster under Discovery’s Dome Mine subsidiary. Proceeds will be reinvested into the Fox Complex (Froome, Stock, Grey Fox), Nevada’s Gold Bar Complex, and Mexico’s El Gallo build, with Stock Mine slated for first ore in Q4 2026 and commercial output in Q1 2027.

    Lithium Triangle extraction hurdles: hydrogeological insights for project teams
    Mining
    about 2 hours ago

    Lithium Triangle extraction hurdles: hydrogeological insights for project teams

    South America’s Lithium Triangle holds about 64 million tonnes of identified lithium resources (43% of the global 150 million tonnes), yet geologist José Cabello’s review of 43 salt flats across Argentina, Bolivia and Chile shows that variable brine chemistry, impurities and groundwater behaviour make recovery and costs highly site-specific. Salar de Atacama benefits from ultra‑dry climate, relatively clean brines and strong logistics, while other basins such as Altoandinos, Pedernales, Hombre Muerto Oeste, Rincón, Sal de los Ángeles and Sal de Vida face tighter water and hydrogeological constraints. Direct lithium extraction (DLE) could unlock lower‑grade or impurity‑rich brines, but Cabello stresses that trade‑offs between brine withdrawal and freshwater consumption mean technology selection must be tailored to each basin’s hydrology and ecosystem.

    KGHM’s $2.4bn copper projects fast-tracked: CRMA implications for mine planners
    Mining
    about 2 hours ago

    KGHM’s $2.4bn copper projects fast-tracked: CRMA implications for mine planners

    EU regulators have granted strategic status under the Critical Raw Materials Act to KGHM’s 9.5‑billion‑zloty ($2.44bn) Retków‑Grodziszcze mine and Legnica smelter conversion, unlocking faster permitting, streamlined administration and access to preferential financing. Retków‑Grodziszcze is planned to deliver over 100 million tonnes of ore by 2055, yielding about 1.5 million tonnes of copper and 5,000 tonnes of silver, while Legnica’s recycling line targets 135,000 tonnes of electrolytic copper and 250 tonnes of nickel per year. The move materially boosts EU copper and nickel recycling capacity, central to the CRMA’s 25% recycling target.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    QCDB-io

    Comprehensive quality control database for manufacturing, tunnelling, and civil construction with UCS testing, PSD analysis, and grout mix design management.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    AllGeotechnicalInfrastructureHazardsEnvironmental