Geomechanics.io

  • Free Tools
Sign UpLog In

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    AllGeotechnicalMiningInfrastructureMaterialsHazardsEnvironmentalSoftwarePolicy
    Projects

    QTS board expansion: what the new engineering leadership means for rail projects

    March 24, 2026|

    Reviewed by Tom Sullivan

    QTS board expansion: what the new engineering leadership means for rail projects

    First reported on The Construction Index

    30 Second Briefing

    Rail contractor QTS Group has expanded its board, promoting Adam Jordan to director of engineering and elevating long-serving engineer Bruno Martin to strategy and technical director, with roles centred on engineering strategy, technical capability and strategic industry partnerships. Former Ardent Hire Solutions HSQE director Tony Vozniak joins as HSQE director, working with compliance director Iain Kirk on licencing, accreditations and business management systems. The moves support QTS’s recent growth to more than 750 staff across 14 UK offices, including its Rench Farm HQ, Manchester and a new Derby office.

    Technical Brief

    • Adam Jordan brings 10 years’ Network Rail experience, directly relevant to rail asset engineering and possession planning.
    • HSQE director Tony Vozniak spent seven years in the same role at Ardent Hire Solutions, a heavy plant-intensive business.
    • Compliance director Iain Kirk’s remit for licencing, accreditations and business management systems underpins RISQS, ISO and rail safety approvals.
    • Concentrating engineering, HSQE and compliance at board level reflects a rail sector shift towards integrated governance of design risk, CDM and operational safety.

    Our Take

    With 750 staff across 14 offices in the United Kingdom, QTS Group now sits in the upper tier of rail-focused infrastructure contractors in our database, which typically gives operators like Network Rail more leverage to bundle multi-region frameworks into single awards.

    The move to bring in leadership with a decade at Network Rail and seven years of HSQE responsibility at Ardent Hire Solutions signals that QTS is likely positioning for higher-risk, safety-critical rail projects rather than purely maintenance work, a pattern seen in several of the larger UK Infrastructure pieces in our coverage.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    National Grid TBM under the Thames: tunnelling design and risk notes for engineers
    Infrastructure
    in 8 months

    National Grid TBM under the Thames: tunnelling design and risk notes for engineers

    A 271.5‑tonne Herrenknecht Mixshield TBM, Caroline, has started driving a 2.2km electricity cable tunnel with a 4m internal diameter beneath the River Thames in Essex for National Grid’s Grain to Tilbury project, delivered by the Ferrovial BEMO joint venture. The drive will pass through variable Thames estuary ground conditions between 35m‑deep launch and reception shafts of 15m and 12m diameter, with tunnelling continuing into 2026 and overall scheme completion targeted for 2029. The new tunnel will replace the 1969 Thames Cable Tunnel and carry new high‑voltage circuits between Grain and Tilbury substations.

    Panama Canal Mixshield undercrossing: design and tunnelling lessons for engineers
    Infrastructure
    in 8 months

    Panama Canal Mixshield undercrossing: design and tunnelling lessons for engineers

    A 13.46m diameter Herrenknecht Mixshield TBM has broken through into the future Balboa station on Panama Metro Line 3 after completing the first-ever TBM undercrossing of the Panama Canal at depths exceeding 60m below sea level. The 5,600kW, 26,616kNm machine, fitted with an accessible cutterhead and more than 4,500 sensors linked via the Herrenknecht.Connected platform, has achieved peak advance of 150 segment rings (about 300m) per month through mixed sandstone, tuff, breccias and basalt. Around 1.5km of the 4.5km twin-track tunnel remains to final breakthrough.

    Hudson Tunnel funding deadline: schedule and risk takeaways for project teams
    Infrastructure
    in 7 months

    Hudson Tunnel funding deadline: schedule and risk takeaways for project teams

    Federal funding for New York’s US$16bn Hudson Tunnel Project has been frozen, forcing the Gateway Development Commission to suspend works from 6 February after spending over US$1bn and employing about 1,000 site workers. A Manhattan federal judge has issued a temporary restraining order, giving the administration until 5 p.m. on 12 February to restore reimbursements or appeal, while contractors warn that demobilisation, resequencing and remobilisation will add cost and delay. Sites are now in “safe-pause” mode, with dewatering, ground support and environmental monitoring maintained, and assembly of two Herrenknecht TBMs in New Jersey likely to slip beyond the planned spring 2026 launch without funding certainty.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.