Geomechanics.io

  • Free Tools
Sign UpLog In
Built byBoxcut Studio

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects

    Minerals 260 high-grade gold intercept: pit design and planning notes for engineers

    October 19, 2026|

    Reviewed by Tom Sullivan

    Minerals 260 high-grade gold intercept: pit design and planning notes for engineers

    First reported on Australian Mining

    30 Second Briefing

    Minerals 260 has intersected 1.1m at 290g/t gold within the Bullabulling gold project, 25km south‑west of Coolgardie in Western Australia, with grade control drilling also returning multiple high‑grade intervals. The company says these results support confidence in the existing 6.2Moz mineral resource, derived from ongoing infill, grade control and extensional drilling across the deposit. For mine planning and geotechnical design, the tighter drill spacing and confirmed high‑grade zones should refine pit shells, scheduling and cut‑off grade assumptions.

    Technical Brief

    • Mineralisation is being constrained using a combination of infill, grade control and extensional drilling datasets.
    • Grade control drilling density will allow more reliable local kriging and short‑range continuity modelling of high‑grade shoots.
    • Extensional drilling informs potential pushback designs and staged pit expansions beyond current resource shells.
    • Infill drilling reduces classification uncertainty between Indicated and Inferred blocks, tightening geotechnical and economic assumptions.
    • High‑grade intervals at metre‑scale thicknesses are critical for blast movement modelling and selective mining unit design.
    • Concentrated high‑grade zones may justify narrower flitch heights and tighter dig lines to minimise dilution.
    • Similar open‑pit gold operations have used such dense drilling to refine slope design sectors and ramp layouts.

    Our Take

    Across several Bullabulling pieces in our database, including the 2025-12-15 and 2026-03-29 drilling updates, Minerals 260 has been progressively reporting higher-grade zones, suggesting the current 6.2‑million‑ounce resource may be increasingly underpinned by a higher-grade core rather than just bulk tonnage.

    The 2026-08-03 article noting a late‑2028 first‑gold target at Bullabulling means intercepts of ~290 g/t over short lengths are likely to be evaluated less as standalone ore blocks and more as potential sweeteners to lift early pit head grades and shorten project payback.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Fortescue copper–arsenic Toowong Process: project economics lens for mine planners
    Mining
    about 2 hours ago

    Fortescue copper–arsenic Toowong Process: project economics lens for mine planners

    Fortescue has sold more than 40 tonnes of copper concentrate treated with its patented Toowong Process, a low-temperature, low-pressure hydrometallurgical circuit that removes arsenic from copper concentrates. Developed and tested over four years after Fortescue acquired the technology, the process targets a longstanding penalty element constraint that limits saleability of high-arsenic ores. Commercial deployment could materially change project economics for arsenic-rich copper deposits, enabling miners to convert previously marginal or stranded resources into exportable concentrate streams.

    Core’s Finniss lithium: 92 m Blackbeard hit and what it means for mine design
    Mining
    about 2 hours ago

    Core’s Finniss lithium: 92 m Blackbeard hit and what it means for mine design

    Core Lithium has reported its longest mineralised downhole intersection at the Blackbeard prospect within the Finniss lithium operation in the Northern Territory, with diamond drillhole NMRD104 returning 92m at 1.25 per cent Li₂O, including 73m at 1.45 per cent Li₂O. The thick, continuous spodumene-bearing pegmatite materially extends known mineralisation at depth and along strike, improving the potential for larger, more coherent underground or bulk open-pit mine designs. For resource modellers and geotechs, the interval supports tighter geological domaining and may justify updated pit shells and geotechnical slope assessments.

    South32 Australian manganese output lift: throughput takeaways for mine planners
    Mining
    about 2 hours ago

    South32 Australian manganese output lift: throughput takeaways for mine planners

    South32 lifted Australia Manganese saleable output 15 per cent quarter-on-quarter to 902,000 wet metric tonnes in the September 2026 quarter, driven by higher utilisation of the primary processing circuit, while keeping full-year production guidance unchanged across its operations. Alumina production also increased, and the company is continuing capital deployment into base metals growth projects, including copper and zinc developments. For mine planners and process engineers, the numbers signal more stable plant throughput assumptions and sustained demand for processing circuit optimisation and debottlenecking work.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental