Geomechanics.io

  • Free Tools
Sign UpLog In
Built byBoxcut Studio

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects

    Military Metals’ four-year Slovak licence: project and permitting notes for engineers

    October 20, 2026|

    Reviewed by Tom Sullivan

    Military Metals’ four-year Slovak licence: project and permitting notes for engineers

    First reported on MINING.com

    30 Second Briefing

    Military Metals has regained its Trojárová exploration licence in Slovakia until 18 October 2030 after the Environment Ministry ruled a May cancellation unlawful, confirming all conditions for a four-year extension were met. The Pezinok-area underground project hosts 6.5 million inferred tonnes grading 1.02% Sb and 1.06 g/t Au (about 67,000 tonnes antimony and 222,000 oz gold) based on 53 diamond drillholes totalling 7,167 m plus underground chip sampling, replacing communist-era data. Mining still needs full environmental assessment and separate production approvals, with planned work on wastewater management and mineral processing in collaboration with the Technical University of Košice.

    Technical Brief

    • Trojárová is an underground antimony–gold project near Pezinok, ~20 km north-east of Bratislava, with existing workings.
    • Trojárová is designated within Slovakia’s national critical-minerals exploration programme submitted to the European Commission, specifically for antimony.
    • Military Metals is engaging the Economy Ministry on specific technical requirements for future mining and production authorisations.
    • Planned collaboration with the Technical University of Košice targets mineral processing flowsheet development and local wastewater management solutions.

    Our Take

    The licence win at the Trojárová antimony-gold project effectively reverses the regulatory setback covered in our 29 May 2026 piece, where the same Slovak ministry’s revocation triggered a share-price collapse, underlining how volatile permitting risk remains for critical minerals in EU jurisdictions.

    The involvement of SLR Consulting at a relatively early stage, alongside an inferred 6.5 Mt resource at modest grades, suggests Military Metals is positioning Trojárová to meet increasingly stringent European ESG and energy-efficiency expectations that SLR has highlighted in other project work in our coverage.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    No credit card required.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Westwin–Traxys $3.9bn, 22‑year nickel offtake: supply and financing lens for projects
    Mining
    about 1 hour ago

    Westwin–Traxys $3.9bn, 22‑year nickel offtake: supply and financing lens for projects

    Westwin Elements and commodities trader Traxys have agreed amended and restated feedstock and nickel offtake contracts that could run for up to 22 years, with the offtake alone worth about $3.96 billion at current prices. The framework secures long-term supply of mixed hydroxide precipitate (MHP) to Westwin’s planned class 1 nickel refinery at the Belwood Industrial Site in Natchez, Mississippi, and sales of refined nickel briquettes. Westwin will scale from its 20-tonne-per-year nickel carbonyl demonstration plant in Lawton, Oklahoma, with the extended tenor expected to support project financing and US supply chain security.

    Aclara’s Penco rare earths project: updated PEA economics for mine planners
    Mining
    about 1 hour ago

    Aclara’s Penco rare earths project: updated PEA economics for mine planners

    An updated preliminary economic assessment nearly doubles the post-tax NPV of Aclara Resources’ Penco Module ionic clay rare earths project in Chile to C$344 million, despite initial capex rising to C$244 million and the discount rate increasing from 5% to 8%. The mine life is extended to 17 years with a 26.1% IRR, processing 30.8 million tonnes and producing a “super pure” carbonate grading about 6% dysprosium, 0.8% terbium, 54.5% yttrium and 4.2% gadolinium. Measured and indicated resources now stand at 35.8 million tonnes at 2,095 ppm TREO, with construction targeted for completion in 2028 and integration into Aclara’s planned Dynamo processing plant in Louisiana.

    Mining
    about 1 hour ago

    Caterpillar R3200 22 t diesel-electric LHD: fleet planning notes for mine engineers

    Caterpillar is preparing to launch the 22 t R3200 diesel-electric LHD, building on the field performance of its 18.5 t R2900 XE, which has already reached at least 21 units in operation at PT Freeport Indonesia via dealer Trakindo. The new R3200 targets higher-capacity underground loading with the same hybrid drivetrain concept aimed at lower fuel burn and reduced heat load compared with conventional diesel units. For mine planners, the move signals continued OEM commitment to diesel-electric fleets as a bridge between traditional diesel and full battery-electric loading.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Tunnelling

    Specialised solutions for tunnelling projects including grout mix design, hydrogeological analysis, and quality control.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental