Geomechanics.io

  • Free Tools
Sign UpLog In
Built byBoxcut Studio

Geomechanics.io

Geomechanics, Streamlined.

© 2026 Geomechanics.io. All rights reserved.

Geomechanics.io

CMRR-ioGEODB-ioHYDROGEO-ioQCDB-ioFree Tools & CalculatorsBlogLatest Industry News

Industries

MiningConstructionTunnelling

Company

Terms of UsePrivacy PolicyLinkedIn
    Projects

    Meeka’s Turnberry decline: 2027 ore schedule and haulage lens for mine planners

    October 12, 2026|

    Reviewed by Tom Sullivan

    Meeka’s Turnberry decline: 2027 ore schedule and haulage lens for mine planners

    First reported on Australian Mining

    30 Second Briefing

    Meeka Metals has begun developing the Fairway decline at the Turnberry underground deposit, its second mine at the Murchison gold project in Western Australia, with first ore targeted for January 2027. Decline development started in October after completing surface infrastructure and the portal in September, signalling the transition from construction to full underground advance. Ore from Turnberry will be trucked about 20km to existing processing facilities, leveraging current plant capacity and limiting new surface footprint.

    Technical Brief

    • Turnberry is being developed as Meeka’s second underground operation on the same project area.
    • Surface infrastructure and portal construction were completed in September, enabling continuous underground advance from October.
    • Centralised processing reduces the need for additional surface plant construction at Turnberry itself.
    • Using an established plant allows capital to be concentrated on underground access and development.
    • Shared processing infrastructure across multiple underground mines is becoming common in Western Australian goldfields.

    Our Take

    Recent drilling at Turnberry reported in our August coverage showed visible gold 200–300m below the current underground resource, so committing to the Fairway decline now suggests Meeka Metals is planning for a mine layout that can chase depth extensions rather than a short, shallow development.

    Across our 1263 Mining stories, relatively few Western Australia gold items combine both new underground access and recent regional tenement acquisitions, so the Murchison gold project and Forrestania belt deals together indicate Meeka is positioning as a multi-hub WA gold operator rather than a single-asset play.

    Geotechnical Software for Modern Teams

    Centralise site data, logs, and lab results with GEODB-io, CMRR-io, and HYDROGEO-io.

    Cancel at any time.

    • Save and export unlimited calculations
    • Advanced data visualisation
    • Generate professional PDF reports
    • Cloud storage for all your projects

    Prepared by collating external sources, AI-assisted tools, and Geomechanics.io’s proprietary mining database, then reviewed for technical accuracy & edited by our geotechnical team.

    Related Articles

    Mining
    about 6 hours ago

    Multotec pipe launder system: retrofit slurry transport notes for plant engineers

    Multotec is promoting a modular, enclosed pipe launder system as an alternative to conventional open launders for high-throughput slurry transport in mineral processing plants that are operating at or beyond original design capacity. The enclosed design is aimed at reducing spillage and product losses while containing spray and aerosols along transfer routes between units such as mills, cyclones and flotation cells. For plant engineers, the system offers a retrofit-friendly option to upgrade slurry handling without major civil works, particularly on congested brownfield layouts.

    Mining
    about 6 hours ago

    Sandvik Rock Processing–Del Rey Minerals deal: aftermarket implications for mine engineers

    Sandvik has agreed to acquire Del Rey Minerals, a Brazil-based supplier of wear and spare parts for mineral processing equipment, which will be integrated into Sandvik Rock Processing’s Screening division. Del Rey Minerals brings an established footprint in the Brazilian mining market and long-term supply relationships with major miners, particularly for high-wear components on crushers and screens. The deal signals Sandvik’s intent to localise aftermarket support in Latin America, with implications for procurement strategies, liner and screen media standardisation, and service response times at large Brazilian operations.

    Mining
    about 6 hours ago

    LiuGong electrified, intelligent fleets at bauma China: key points for mine operators

    LiuGong has unveiled 39 machines and industry solutions in a 4,224‑sq.m “Tough World. Tough Equipment” pavilion at bauma China in Shanghai, with more than 60% of the exhibits being new products. Around 90% of the display is dedicated to electrified and intelligent technologies, signalling a rapid pivot towards battery-electric and smart control systems across its construction and mining portfolio. For mine operators, this points to accelerating availability of OEM-supported zero‑carbon fleets and data‑rich equipment platforms for haulage, loading and auxiliary duties.

    Related Industries & Products

    Mining

    Geotechnical software solutions for mining operations including CMRR analysis, hydrogeological testing, and data management.

    Construction

    Quality control software for construction companies with material testing, batch tracking, and compliance management.

    CMRR-io

    Streamline coal mine roof stability assessments with our cloud-based CMRR software featuring automated calculations, multi-scenario analysis, and collaborative workflows.

    HYDROGEO-io

    Comprehensive hydrogeological testing platform for managing, analysing, and reporting on packer tests, lugeon values, and hydraulic conductivity assessments.

    GEODB-io

    Centralised geotechnical data management solution for storing, accessing, and analysing all your site investigation and material testing data.

    AllGeotechnicalInfrastructureHazardsEnvironmental